background image

1

Prepare

Supplies listed in the following table are required for this installation.

2

Rackmount the BNP 3xr

1. Use the rack-mount screws to attach the front rack-mount 

bracket to one side of the chassis. Repeat on the other side of 

the chassis.

2. Secure the front of the chassis to the rack.

3. Slide the mounting brackets to the correct distance and secure 

them.

4. Seat the chassis on the rear mounting shelf.

5. Ground the chassis.

The BNP 3xr can be used with one to four modules, depending on 

your requirements.

3

Recommended SFPs

Install approved SFPs according to the manufacturer’s instructions:

4

Connect the Ports

Use the correct cable for the port type and your network 

configuration:

10/100BaseT Ethernet port, used to communicate with the 

management network. 

ASI ports, located on the rear of the chassis. Use a push/twisting 

motion to ensure proper seating of the cables.

The Gigabit Ethernet ports must have approved SFPs before 

cabling.

5

Power Up

1. Connect all ports before applying power.

2. Connect power to the chassis:

For AC power

: plug one end of the AC power cable into the 

BNP 3xr power connector. If using two power supplies, plug 

the second AC power cable into the other AC power 

connector. Plug the other end of the power cable(s) into the 

input power source. The unit should now have power. 

For DC power

, cut the provided DC connector cables to the 

correct length to reach the BNP3xr from the power source. 

Attach the connector cables from the power source to the 

BNP3xr power connectors. Attach the other end of the 

power connector cables into the input power source. Toggle 

the external circuit breaker to the ON position. The unit 

should now have power.

3. Verify power: at the BNP 3xr, check to ensure that the Cfg/Pwr 

LED is solid green. The PSU1 and/or PSU2 LEDs on the front of 

the chassis should also be solid green.

Selenio™ Broadcast Network Processor 

Quickstart for BNP 3xr

Provided in your shipping carton

You provide

BNP 3xr chassis with installed 

modules.

Phillips screwdriver

AC power cord, for AC system, or

DC connector cables, for DC system.

Eight rack-mount screws.

Front and rear rack-mount brackets.

Ethernet cable: for connectivity between the 

BNP and the Management workstation.

One M4 grounding nut.

One or more GigE copper or optical SFP 

modules.

Manufacturer

Part Number

Description

Finisar

FTLF1519P1BCL

SFP 1550nm GigE optical module

a

a. These are some of the units being qualified; 

Imagine Communications 

continues 

to qualify units to the specification. Please contact 

Imagine Communications 

for 

an update on current SFPs.

Finisar

FCMJ-8521-3

1000BaseT Copper SFP Transceiver

Avago

ABCU-5710RZ

SFP 1550nm GigE optical module

Fiberdyne

FGE-SFP-T

1000BaseT Copper SFP Transceiver

Attach the rear mounting

shelf to the rack

Rear view of rack

Front view of rack

1

3 4 5 6

2

SLOT A

SLOT C

SLOT B

SLOT D

Rear of BNP 3xr
(AC Power)

ASI Ports

Rear of BNP 3xr (AC Power)

Eight GigE Ports

10/100 Ethernet

Front of BNP 3xr

Mgmt Port

Compact Flash

Cfg/Power

Fault

Backup

Port SFP

10/100 Ethernet

LEDs

Dual Redundant Hot-Swappable Fans

Mgmt Pot

Отзывы: