Nexio AMP® Gen-7
Installing the Chassis
2014 Imagine Communications | All Rights Reserved
Page 22 of 42
Installing the Chassis
1.
Pull the middle rail out from the front of the outer rail. Make sure that the ball-bearing shuttle is at
the front locking position of the middle rail.
2.
Align the chassis inner rails with the front of the middle rails.
3.
Slide the inner rails on the chassis into the middle rails on the rack. Keep the pressure even on both
sides until the locking tab of the inner rail clicks into the front of the middle rail. The chassis should
now be locked into the fully extended position.
4.
Press the locking tabs down on both sides of the unit at the same time and push the chassis all the
way back to the rear of the rack.
For added security, you can use screws to secure the chassis handles to the front of the rack.