![Image Engineering iQ-AF Box Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/image-engineering/iq-af-box/iq-af-box_user-manual_2045171004.webp)
Image Engineering
Seite
4
von
5
2 GETTING STARTED
2.1 Scope of Delivery
•
iQ-AF Box
•
Set of fluorescent tubes (D50)
•
Power cable
•
Test chart
3 OPERATING INSTRUCTIONS
3.1 Overview
The fluorescent tubes must be burned for 100 hrs. before you can start with the measurement.
Warm-up time: 10 minutes.
.
•
The left switch turns on the left and right fluorescent tubes, while the right switch turns on the fluorescent
tubes above and below. Below the switches is the input for the power cable.
•
With the rotary control units, you can vary the intensities of the fluorescent tubes. The switch above can
quickly shift between two previously adjusted light intensities without measuring the illuminance again.