IKEA ENHET Скачать руководство пользователя страница 2

2

The installation guide

Installing your new ENHET kitchen correctly

This brochure is your guide to preparing and 

installing your new kitchen yourself. Inside you’ll 

find clear steps to follow as well as useful tips and 

ideas. Use this guide along with your IKEA assembly 

instructions to make sure your kitchen is installed in 

the right way.

Before you begin

Go through this brochure before you begin to see 

what stages are involved in putting in your new 

kitchen and organizing what tools you’ll need. 

To make sure you have everything for your new 

kitchen, compare the packages and parts you have at 

home against the order list and the freight list. You 

should only dismantle your old kitchen when you have 

all your new parts and appliances. Your kitchen parts 

and countertop should be stored indoors, with normal 

room temperature and humidity. 

Before you remove your old kitchen, make sure that 

your electricity, gas and water are shut off. Use a 

qualified professional to disconnect and connect your 

gas, water and electricity.

You can do it yourself but you don’t have to

Although our kitchens are designed to be as simple 

as possible for you to assemble and install yourself, 

it is important to consider all aspects of a kitchen 

renovation, where some key operations, such as 

safeguarding a proper wall cabinet installation or 

cutting your countertop, require more skill and 

experience than others.

We can offer you services ranging from planning and 

delivery to complete kitchen installations. For more 

details see the back page of this guide, kitchen section 

of IKEA.ca or contact your local IKEA store.

Table of contents

Tools and materials ................................................................................................ 03
Preparing your room .............................................................................................. 04
Assembling the cabinets and frames ...................................................................  07
Installing the wall cabinets .................................................................................... 08
Installing suspension rail for wall and base open frames ................................. 09
Installing the base cabinet/frames .......................................................................  10
Installing the countertop ........................................................................................ 11
Installing the sink and faucet ................................................................................  12
Installing the appliances ........................................................................................  13
Installing plinth .......................................................................................................  14
Installing lighting, drawers, doors, shelves, knobs and handles. .....................  15
You’re done! Congratulations on your new kitchen! ..........................................  16
Notes ......................................................................................................................... 17
Services ....................................................................................................................  18

Содержание ENHET

Страница 1: ...A guide to installing a new ENHET kitchen ENHET kitchen installation guide...

Страница 2: ...a qualified professional to disconnect and connect your gas water and electricity You can do it yourself but you don t have to Although our kitchens are designed to be as simple as possible for you t...

Страница 3: ...el Try square Spirit level Caulking gun Step ladder Stud finder Pencil Philips screwdriver Awl Hammer Rubber hammer G clamp Scissors Saw and Miter box Protective gloves and goggles Electric screwdrive...

Страница 4: ...f your walls Drywall or plaster with available wood stud Drywall without available wood stud Masonry Make sure that your electricity gas and water are shut off Use a qualified professional to disconne...

Страница 5: ...s will be located at the same position as your old ones it is important to secure that the walls have been properly reinforced Use a cross line laser level to find the highest point marked A in the pi...

Страница 6: ...l units at 84 2146 mm from the highest point A and trace a horizontal line as with the other mark The line represents the top position of the wall cabinets and frames 3 With the lines marked double ch...

Страница 7: ...w it is a good idea if you assemble all cabinets frames one by one and push them aside until the time comes to install them It s helpful if you arrange your cabinets in the order you will be installin...

Страница 8: ...e end and move on Just make sure that you follow the marks you made for your kitchen layout the units should be aligned with the top line wall units drawn by you The first unit will set the standard f...

Страница 9: ...fely attached to the wall When working with concrete walls it s important to know what kind of fittings and tools to use NOTE The screws provided by IKEA do not work in concrete Contact your local dea...

Страница 10: ...when aligning the cabinets and frames As you proceed with the next cabinet level and align the two cabinets by using a clamp Use the screws provided to attach the adjacent cabinets Don t forget to le...

Страница 11: ...ut out by positioning the countertops in the correct position Then mark out the sink cut out and if needed also for the faucet Secure that you do all the cut outs before you fix the countertop to the...

Страница 12: ...p material NOTE The installation of the water trap and water is not done or finalized until the plumbing is connected by an professional plumber and confirmed by them that it s safe to use If you need...

Страница 13: ...al safety regulations Before you install your extractor hood make sure you follow the specified minimum distance between cooktop and extractor hood that is listed in the assembly instruction Again we...

Страница 14: ...ndsaw to cut a 22 562 mm piece Then sand the open edge before you apply the pre glued edge band that comes with the plinth Follow the assembly instructions to attach the plinth Remember to remove the...

Страница 15: ...ons must be made by a qualified electrician If drilling holes use a piece of wood to meet the drill as it penetrates the surface to prevent the edges from splintering Next follow the assembly instruct...

Страница 16: ...use wipe the sink clean with a cloth or sponge damped in water or a non abrasive detergent if necessary Rinse the bowl with water and then wipe the sink with a dry cloth Avoid scouring powder steel w...

Страница 17: ...17 Notes...

Страница 18: ...ppliances and storage to lighting and sinks In store assisted self planning Drop in to an IKEA store and we can assist you with your kitchen plans In store one on one planning up to 2 hours If you pre...

Страница 19: ...stallation is provided by an independent service provider and includes assembly and installation of cabinets drawers doors and interior fittings Price quotes are available through each service provide...

Страница 20: ...we re happy to answer your call You can reach us over the phone at 1 866 866 IKEA 4532 Installation Services Save time and effort with professional installation For full details visit IKEA ca kitchen...

Отзывы: