
19
Personal protection - preparing for operational readiness
Please note:
Please note: operational readiness requires that the IKAR sleeve has already been installed prop-
erly. Note whether it is horizontal or vertical.
Insert the cantilever arm into the IKAR sleeve.
Release the socket pin (
A
) by pressing with the thumb and pull out.
Then fold the cantilever arm upwards (
B
) and secure with the socket pin (
C
).
The ASS-2 cantilever arm is now ready for basic use.
It is disassembled in the reverse sequence.
B
C
Similar to illustration
1
2
A
GB
Содержание ASS-2
Страница 4: ...4...
Страница 12: ...12...
Страница 89: ...89 IKAR IKAR A B C ASS 2 B C 1 2 A GR GR...
Страница 90: ...90 IKAR IKAR HRA IKAR 1 HRA IKAR 2 2 HRA 1 3 4 HRA HRA IKAR 1 2 4 3 GR...
Страница 91: ...91 1 2 3 4 RL 2006 42 IKAR PLW IKAR PLW IKAR IKAR 41 54 AWS M10x16 PLW IKAR IKAR IKAR IKAR IKAR 1 2 5 GR...
Страница 92: ...92 2 2 2 HRA 2 Superwinch X2 G 4 m 55 Watt 12 Volt GR...
Страница 93: ...93...
Страница 94: ...94...
Страница 95: ...95...