background image

24

Connections between device and external devices:

PC 1.1 Cable:
This cable is required to connect RS 232 port to a PC.

1
2 RxD

3 TxD

4

5 GND

6

7 RTS

8 CTS

9

1

RxD 2

TxD 3

4

GND 5

6

RTS 7

CTS 8

9

PC

1  

2  

3  

4  

5

6  

8  
9

9  

8  

7  

6

5  

4  

3  

2  

1

Fig. 28

IN_TMODE

Read temperature control: 
(0: internal control)
(1: external control)

OUT_SP_1 xxx

Set the internal setting temperature XXX (if 

0: internal control

)

Set the external setting temperature XXX (if 

1: external control

)

OUT_SP_12@n

Set the WD safety temperature with echo of the set (defined) value.

OUT_SP_4 xxx

Set the pump speed XXX

OUT_SP_42@n

Set the WD-safety speed with echo of the set (defined) value.

OUT_TMODE_0

Set to internal temperature control

OUT_TMODE_1

Set to external temperature control

OUT_WD1@n

Start the watchdog mode 1 and set the time for the watchdog to n (20...1500) seconds.
Echo of the Watchdog time.
During a WD1-event, th

e cooling an

d pump functions are switched off 

and message PC 1 is display.

This command needs to be send within the watchdog time. 

OUT_WD2@n

Start the watchdog mode 2 and set the watchdog time to n (20...1500) seconds.
Echo of the watchdog time. 
During a WD2-event, the set temperature is changed to the WD safety temperature and the pump 
set speed is set to the WD safety speed. 

The PC 2 warning is displayed.

This command needs to be send within the watchdog time. 

RESET

Reset the PC control and stop the device functions.

START_1

Start the tempering function 

START_4

Start the pump function

STOP_1

Stop the tempering function

STOP_4

Stop the pump function

Fig. 29

USB micro B

USB A

USB 2.0 Cable A - micro B:
This cable is required to connect USB port to a PC.

Fig. 30

USB 2.0 cable micro A - micro B:
This cable is required to connect 

WiCo

 to 

station

.

USB micro B

USB Micro A

A

Содержание RC 5 control

Страница 1: ...20000019508a IKA RC 5 control RC 5 control_062018...

Страница 2: ...m Designation 1 Filling opening lid 2 Wireless Controller WiCo 3 Handle 4 Venting grid 5 RS 232 port 6 USB port 7 External temperature sensor socket 8 Multifunction port 9 Pump connector IN 10 Pump co...

Страница 3: ...ngs 8 Inserting battery into the WiCo 9 Mounting the WiCo to the station 9 Filling and draining 9 Fluids Standard information for IKA fluid 11 Moving the device 12 Charging the Battery Pack RB 1 recha...

Страница 4: ...s device complies with Industry Canada license exempt RSS standard s Operation is subject to the following two conditions 1 This device may not cause interference 2 This device must accept any interfe...

Страница 5: ...use additional appropriate measures to ensure safety in the experiment For ex ample users can implement comprehensive monitoring equipment Process pathogenic material only in closed vessels under a su...

Страница 6: ...nd temperatures above 60 C High tem peratures will damage the battery pack and render it unus able Temperatures above 100 C may cause it to explode Never throw the battery pack into water or expose it...

Страница 7: ...ly ing with statutory regulations and helping to protect the environment Batteries must be disposed of in accordance with local and national regulations Correct use Use Use RC Refrigerated Circulators...

Страница 8: ...e cooling system Connecting the tubings Unscrew the union nuts and stoppers using a wrench SW 19 from the pump connector IN 9 and OUT 10 Connect the hoses for circulating the external system to the pu...

Страница 9: ...uded back ow cap External system IKA Calorimeter Fig 6 Inserting battery into the WiCo Model WiCo CBC 5 LPS IP 40 Model WiCo CBC 5 LPS IP 40 Model WiCo CBC 5 LPS IP 40 Note notch upward Model WiCo CBC...

Страница 10: ...hat the drain valve is closed rotate clockwise to the stop position see Fig 10 Note Please note information in section Commission ing Connect the power plug and turn on the device with power switch 11...

Страница 11: ...mperature Maximum temperature N Negative Temperature 4 Viscosiy Viscosiy at 25 C for Heating Fluid HF Viscosity at 20 C for Cooling Fluid CF Viscosity at 25 C for Universal Fluid UF Dynamic viscosity...

Страница 12: ...10 H 44 Boss head clamp H 38 Holding rod IKA RC 5control IKA RC 5 control IKA RC 5control Moving the device Empty all uid in the bath before move device from one place to other place The device must b...

Страница 13: ...High Low Fluid level Fig 16 A F D E B C Item Designation Function L On Off button Switch the WiCo on and off M int ext button Switch between the internal and external temperature display and control N...

Страница 14: ...ce The refrigerating function may delay to start at maximum 2 minutes In working status press the right knob R to stop opera tion of the pump The refrigerating function and the pump stops Note In stan...

Страница 15: ...Co and the station The screen below shows the most signi cant symbols on the work ing screen Bluetooth This symbol means the station and the WiCo are com municating via Bluetooth The symbol no longer...

Страница 16: ...enu by turning the right rotating pressing knob R to the right or left Open the menu item by pressing the right rotating pressing knob R Turn the rotating pressing knob R to select the desired menu op...

Страница 17: ...A C B D activated GRAPH Automatic Manual Axis Assignment Set Temperature Actual Internal Temp Actual External Temp X Axis Y Axis 15 min 30 min 60 min 120 min Axis Scaling Maximum Minimum activated act...

Страница 18: ...ifference between the external system and internal bath during the heating up and cooling down process This can pro tects sensitive device like the glass reactors from thermal shock e g glass break Kp...

Страница 19: ...Step 1 2 Enter the temperature from the measuring device 32 00 oC OK Calibration Internal 2 Point Calibration Step 1 2 Enter the temperature from the measuring device 32 00 oC OK Calibration Internal...

Страница 20: ...t of up to 10 segments Once a program has been selected the following op tions are available 1 Start Starts the program upon request of loop mode 1 In nite loop Upon completion of the last segment the...

Страница 21: ...ve switch on point ON Stop Set the valve switch off point OFF Note Prior to using the Re ll menu option check the function of the buoyage The Re ll menu option has higher priority than the program M1...

Страница 22: ...The Information option offers the user an overview of the most important system settings of the device SAFETY 1 Time out 1 Set In the menu Set the user can determine a time limit in the event of a com...

Страница 23: ...p mode Type of transmission full duplex Character format character representation in accordance with data format in DIN 66 022 for start stop mode 1 start bit 7 character bits 1 parity bit even 1 stop...

Страница 24: ...1 and set the time for the watchdog to n 20 1500 seconds Echo of the Watchdog time During a WD1 event the cooling and pump functions are switched off and message PC 1 is display This command needs to...

Страница 25: ...M3 Input standby 0V only for Standby 7 reserved for later use do not connect 8 reserved for later use do not connect 1 2 3 4 5 6 7 8 Fig 33 Multifunction interface USB micro B USB micro A Connection...

Страница 26: ...taining tenside Fuel Water containing tenside For materials which are not listed please request informa tion from IKA application support Wear protective gloves while cleaning the instruments Electric...

Страница 27: ...rigerating off Discharge temperature error Restart the device Error 19 Pump off Refrigerating off Fluid temperature too high Switch the device off and let the uid cool down Error 20 Pump off Refrigera...

Страница 28: ...minal width 8 H SI 12 Silicone hose nominal width 12 H PUR 8 PUR tube nominal width 8 mm H PUR 12 PUR tube nominal width 12 mm H FKM 8 FKM tube nominal width 8 mm H FKM 12 FKM tube nominal width 12 mm...

Страница 29: ...mperature setting resolution K 0 1 Temperature display TFT LCD on WiCo Temperature display resolution K 0 01 Cooling capacity according to DIN 12876 at 4600 rpm 20 C 10 C 0 C 10 C 20 C 30 C W 1400 120...

Страница 30: ...nt temperature oC 5 40 Ambient humidity relative 80 IP code according to EN 60 529 IP 40 Interface USB RB 1 Battery pack Voltage V 3 7 Charging capacity mAh 2000 Charging time h 4 5 Working time h 15...

Страница 31: ...le for freight costs The warranty does not cover worn out parts nor does it apply to faults resulting from improper use insufficient care or maintenance not carried out in accordance with the instruct...

Отзывы: