background image

Rev. 
29/09/2020

 

Instron 3365 Load cell switching guide

 

 

 

7.

 

Insert the cell in the machine bar. Look for the hole marked in green. 

 

8.

 

Tighten the top screw with the 8 mm hex key 

9.

 

Mount the clamp, following the steps 1 c, b, a. 

10.

 

Plug the cell cable in the “carico” port. Take care to avoid tangling the cables! 

11.

 

Check that the Load signal is correctly shown in the Bluehill Universal sotfware 

Отзывы: