Rev.
29/09/2020
Instron 3365 Load cell switching guide
7.
Insert the cell in the machine bar. Look for the hole marked in green.
8.
Tighten the top screw with the 8 mm hex key
9.
Mount the clamp, following the steps 1 c, b, a.
10.
Plug the cell cable in the “carico” port. Take care to avoid tangling the cables!
11.
Check that the Load signal is correctly shown in the Bluehill Universal sotfware