Test all gas piping and connections for leaks after
installing or servicing. Correct all leaks at once.
•
Never use an open flame to check for a leak. Apply a
noncorrosive leak detection fluid to all joints. Bubbles
forming show a leak. Correct all leaks at once.
2
IHP reserves the right to make changes at any time, without notice, in design, materials, specifica-
tions, prices and also to discontinue colors, styles and products. Consult your local distributor
for fireplace code information.
REFRACTORY PANEL INSTALLATION
IMPORTANT: Installation of refractory panels should
be done after the fireplace is placed in a permanent
location.
1. Remove screen assemblies and all hardware components out of
the firebox.
2. Make sure the bottom refractory panels is centered in the firebox
and flush with the front of the fireplace.
3. Match the top and bottom of the refractory panels before install-
ing.
4. Using one (1) of the refractory brackets and two (2) of the self
tapping screws, install rear refractory panel, center bracket and
screw it to the top of firebox, See Figure 2.
5. Install the right and left refractory panels with the gas line knock-
outs orientated down toward the bottom refractory secure them
with the remaining refractory brackets and self tapping screws.
6. Install the items removed in step 1.
WARNING
LIFTING HAZARD
SINGLE -PERSON LIFT COULD
CAUSE INJURY.
USE ASSISTANCE WHEN MOVING
OR LIFTING.
1769 East Lawrence Street • Russellville, AL 35654
Figure 2 - Refractory Panels Installed
Retaining
Bracket
Rear
Refractory
Left
Refractory
Screw
f i r e - p a r t s . c o m