23
8.3 Commisioning when starting up the boiler
- Close drain valve
- Fully open the valves to the boiler
- Device is heated up together with the boiler
8.4 Commisioning during boiler operation
- Fully open drain valve
- Slightly open upper valve to boiler, carefully heat up device with steam until operating
temperature is reached.
- Close drain valve
- Slowly open upper and lower valve to the fully open position.
9. Technical Data
9.1 Device data
Manufacture in accordance with:
EC Directive 2006/95/EC
EC directive 2004/108/EC
EC Directive 97/23/EC (2003), Annex III; Module D1, (Category II)
Applied standards:
DIN EN 61000 -6-2: 2011-06
DIN EN 61000 -6-4: 2011-09
DIN EN 61000 -3-2: 2010-03
DIN EN 61000 -3-3: 2009-06
DIN EN 61010-1: 2010
Other Technical Regulations:
Wasserstand 100 (Water level 100) dated February 2010
Data exchange:
CAN-Bus in accordance with DIN ISO 11898, CANopen protocol
Number of probes:
2 to 32
Total length of CAN-Bus:
max. 500m
Electrical conductivity of the liquid: 0.5 µS/cm
≤
æ
≤
10,000 µS/cm (25°C)
Probes / add-on housing:
Allowable pressure
PS [bar]
32
50
80
100
160
200
Allowable temperature
TS
[°C]
239
265
296
312
348
367
Probe
Type
EL65
EL60
Item no.
15-01877
15-00790
Insulator
PTFE
Ceramic
Connection thread
G ½”
Width across flats
WF27
Electrode spacing
At least 36 mm with offset arrangement
Material screw connection
Stainless steel
Material electrode tip
Stainless steel
Material add-on housing
SA106 GrB (Standard); materials according to DIN or ASME
Process connection
according to DIN or ANSI; Flange or welding end