![IFM LW2720 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/ifm/lw2720/lw2720_operating-instructions-manual_3929236017.webp)
Electronic level sensor
LW2720
17
1
d
D
L
2
1: Leakage port
2: Seal
u
To avoid dead space adhere to the dimensions:
L < (D - d)
d = 25 mm
6.6.2 Notes on the use according to 3-A®
u
Make sure that the sensor is integrated into the system according to 3-A.
u
Use only adapters with 3-A qualification and marked with the 3-A symbol. Available accessories:
The process connection must be provided with a leakage port. This is ensured when installed using
adapters with 3-A approval.
u
Install leakage ports so that they are clearly visible.
u
It is recommended to choose an installation position where the probe and the process connection
can be cleaned with a spray ball.
For use according to 3-A, special regulations apply for cleaning and maintenance.
Not suitable for systems that have to meet the criteria of E9.2 of the 3A standard 63-04.
6.7 Mounting in a threaded connection
A
Fig. 10: Threaded mounting
Thread length requirements (A) for the G1 process connection on the
tank:
Required thread length (A)
A
min
8 mm (0.32 in.)
A
max
16 mm (0.63 in.)
6.8 Mounting preparations
6.8.1 Remove the protective cap
The protective cap protects the antenna from impacts during transport and storage.
GB