Starter kit for ecomatController EC2121
8
2
Prepare the controller
Content
Hardware installation ................................................................................................................................ 8
Install UpdateTool on the PC.................................................................................................................... 8
Establish a connection between the controller and the PC via Ethernet. ................................................ 9
Check and update OS version ...............................................................................................................12
57257
>
2.1
Hardware installation
57258
Connect the 81-pole AMP connector to the controller:
► Pull out the locking slide on the connector until the end stop.
► Attach the connector to the controller and click home.
► Insert the slide to lock the connector on the controller.
>
The AMP connector is connected to the controller.
Connect the voltage supply via an external voltage source 24 V DC (not supplied):
► Connect the voltage source to both 4 mm lab sockets on the prewired connection cable:
plus pole - red
minus pole - black
>
The LEDs
SYS0
and
SYS1
are on or flash green.
If one of the LEDs
SYS0
or
SYS1
is permanently on in red, there is a hardware fault or system
fault (
→ Data sheet CR711S > Operating states of the system).
>
2.2
Install UpdateTool on the PC
57259
To install the UpdateTool_Vn.n.n.n on the PC:
► Copy the folder
x:\ecomatController\UpdateTool_Vn.n.n.n
from the supplied USB flash
drive to the PC.
The user must have write access in the target directory.
The directory path must not contain any blanks.
Recommendation: Copy the UpdateTool to the desktop or the project folder.