background image

 

 
SU0246.DOC   05/04 

Änderungen vorbehalten! 

 

 

Operating Instructions

 

GNR5C

 Sight-Glass Level Controller

 

 

 

 

 

 

 

Figure. 1:  GNR5C with threaded connectors and 2 

BSM500W_/d34 bistable switches 

 

Attention! 

 

• 

Use with low-viscosity media only which 
neither tend to become sticky or encrusted, 
nor precipitate crystals. Media may not 
contain magnetic particles (e.g. metal chips). 

• 

Use only type S5/25d floats. 

• 

The float must be installed with the “TOP” 
marking at the top. 

• 

Observe maximum temperature and pressure 
ratings. 

• 

Do not allow to tilt during installation! Centre-
to-centre distance and squareness of the 
flanges or threaded connectors should be 
checked before installing the glass tube. 

• 

Observe correct installation order for sealing 
rings (see drawing next page). 

Functional Principle: 
 

The GNR5C sight-glass level controller is mounted to the 
side of a vessel or a tank. The gauge is filled with liquid 
media to the same level as the tank via two shut-off 
valves. 
A magnetic float is located within the standpipe, which 
indicates the current fill-level. 
The glass tube is protected against damage with a 
semicircular impact guard made of transparent PVC. 
The magnetic float can also be used to activate optionally 
available BSM 500 W... bistable switches (see also data 
sheet SU0090). 

 
 

 

Technical Data 

 

 

Standpipe 

Glass, DURAN. 34.5 x 2.75 mm 

Float 

Polypropylene (PP), type S5/25d 

Fittings 

Stainless steel 1.4404/316L with 
EPDM sealing 

Seals Silicon 

rubber 

Operating temperature 

0 to + 110° C (120° C intermittent) 

Operating overpressure 

max. 1 bar 

Length (flange centre-to-
centre) 

300 to 2000 mm 

Mounting 

Flange: DIN 2642 DN 25 PN, steel 
alternatively DN20 PN10 steel 
or 
threaded connector: G½" or G1" 

Discharge stopcock 
(optional) 

stainless steel 1.4404 

Electrical components 

BSM 500 W... bistable switch 
with 34 mm dia. pipe clamp 

 
Installation Procedure: 

 

GNR5C with Flanges: 

• 

Mount the top and bottom shut-off valves to the tank 
flanges using suitable sealing materials. Do not yet 
fully tighten the screws. 

• 

Insert the 11 x 12 x 5 mm silicon discs into the shut-off 
valves. 

• 

Push the hose clamps for fastening the impact guard 
and the sleeve nuts, along with the silicon rings (which 
have been snapped into place inside the nuts), over 
the standpipe (see figure 2). 

• 

Insert the standpipe between the shut-off valves 
making sure that is square. 

• 

Check the length of the glass tube! The tube must fit 
flush against the silicon discs. Loosen the flange 
screws if necessary to correct distance and 
squareness. 

• 

Retighten the flange screws. 

• 

Push the sleeve nuts up to the shut-off valves and 
tighten (46 mm open-end wrench). 
Tighten the sleeve nuts! 

• 

Attach BSM 500 W… bistable switches if used (the 
cable gland must always point down). 

• 

Mount the transparent impact guard (see figure 2). 

• 

After the vessel has been filled, check all fittings for 
leaks! 