HTB-200-C236 Embedded System
Page 14
3.3 Opening Top Cover
Before the internal components can be installed, the top cover must be opened. To open
the top cover, please follow the steps below:
Step 1:
Remove the top cover retention screws. The top cover is secured to the chassis
with 3 retention screws. All screws must be removed (
).
Figure 3-1: Top Cover Retention Screws
Step 2:
Slide the top cover towards the rear side and gently lift the top cover to remove
the cover from the system.
Step 0:
Содержание HTB-200-C236
Страница 12: ......
Страница 13: ...HTB 200 C236 Embedded System Page 1 Chapter 1 1 Introduction ...
Страница 20: ...HTB 200 C236 Embedded System Page 8 Chapter 2 2 Unpacking ...
Страница 23: ...HTB 200 C236 Embedded System Page 11 Chapter 3 3 Installation ...
Страница 43: ...HTB 200 C236 Embedded System Page 31 Chapter 4 4 BIOS ...
Страница 82: ...HTB 200 C236 Embedded System Page 70 Chapter 5 5 Troubleshooting and Maintenance ...
Страница 88: ...HTB 200 C236 Embedded System Page 76 Chapter 6 6 Interface Connectors ...
Страница 92: ...HTB 200 C236 Embedded System Page 80 Appendix A A Regulatory Compliance ...
Страница 97: ...HTB 200 C236 Embedded System Page 85 B Safety Precautions Appendix B ...
Страница 103: ...HTB 200 C236 Embedded System Page 91 Appendix C C BIOS Menu Options ...
Страница 106: ...HTB 200 C236 Embedded System Page 94 Appendix D D Watchdog Timer ...
Страница 109: ...HTB 200 C236 Embedded System Page 97 Appendix E E Error Beep Code ...
Страница 111: ...HTB 200 C236 Embedded System Page 99 Appendix F F Hazardous Materials Disclosure ...