GRAND-C422-20D
Page 24
3.5 Power-On Procedure
3.5.1 Installation Checklist
WARNING:
Make sure a power supply with the correct input voltage is being fed into
the system. Incorrect voltages applied to the system may cause damage to
the internal electronic components and may also cause injury to the user.
To power on the GRAND-C422-20D, please make sure of the following:
The HDD/SSD is installed
The LAN cable is connected
The power cables are plugged in
The system is securely mounted
3.5.2 Power-on Procedure
To power-on the GRAND-C422-20D please follow the steps below:
Step 1:
Connect the power source to the power input jacks.
Figure 3-9: Power Connection
Содержание GRAND-C422-20D
Страница 2: ...GRAND C422 20D Page ii Revision Date Version Changes January 28 2019 1 00 Initial release...
Страница 9: ...GRAND C422 20D Page 1 Chapter 1 1 Introduction...
Страница 19: ...GRAND C422 20D Page 11 Chapter 2 2 Unpacking...
Страница 21: ...GRAND C422 20D Page 13 1 Screw pack for 3 5 HDD installation Table 2 1 Package List...
Страница 22: ...GRAND C422 20D Page 14 Chapter 3 3 Installation...
Страница 34: ...GRAND C422 20D Page 26 Chapter 4 4 Maintenance...
Страница 39: ...GRAND C422 20D Page 31 Appendix A A Regulatory Compliance...
Страница 44: ...GRAND C422 20D Page 36 Appendix B B Safety Precautions...
Страница 49: ...GRAND C422 20D Page 41 Appendix C C Hazardous Materials Disclosure...