Afterwards, all controls should be inspected regularly for 
proper operation. Some components may experience 
erratic operation or failure due to age. Wall thermostats 
may also become clogged with dust and lint and should 
be periodically inspected and cleaned to provide reliable 
operation.

When replacing any components such as fuses, contractors, 
or relays, use only the exact type, size and voltage 
component as furnished from the factory. Any deviation 
without factory authorization could result in personal 
injury or damage to the unit. This will also void all factory 
warranties. All repair work should be done in such a manner 
as to maintain the equipment in compliance with governing 
codes, ordinances and testing agency listings.

More specific information regarding the use and operating 
characteristics of the standard controls offered by the 
manufacturer are contained in other manuals.

Valves and Piping

No formal maintenance is required on the valve-package 
components most commonly used with fan coil units other 
than a visual inspection for possible leaks in the course of 
other normal periodic maintenance. In the event that a 
valve should need replacement, the same precautions taken 
during the initial installation to protect the valve package 
from excessive heat should also be used during replacement.

Filters, Throwaway

The type of throwaway filter most commonly used on fan coil 
units should be replaced on a regular basis. The time interval 
between each replacement should be established based 
on regular inspection of the filter and should be recorded 
in the log for each unit. Refer to the product catalog for the 
recommended filter size for each product type and size. If 
the replacement filters are not purchased from the factory, 
the filters used should be the same type and size as those 
furnished from or recommended by the factory. Pleated 
media or extended surface filters should not be used since 
the high air pressure drops encountered.

with these types of filters are not compatible with the type 
of fan coil unit covered in this manual. Consult the factory for 
applications using filter types other than the factory standard 
or optional product.

Filters, Permanent

A maintenance schedule for permanent filters should be 
developed in the same manner as throwaway filters. Unlike 
throwaway filters, permanent filters may be cleaned and 
re-installed in the unit instead of being discarded when dirty. 
The optional factory permanent filter may be cleaned in hot 
soapy water to remove any trapped dirt. It should then be set 
aside on edge to dry.

Before replacing the filter in the unit, it should be recharged 
with some type of entrapment film such as “Film-Cor 
Recharging Oil.”  The filter should be sprayed on both sides 
or submerged in the film to assure complete coverage. The 
filter should not be allowed to soak in the film, but should 
be immediately removed and the excess film drained from 
the filter before re-installation in the unit. Consult a local 
filter supplier for types of available cleaning solutions and 
charging films.

It should be noted that permanent filters normally have less 
static pressure loss than throwaway filters.

Drain

The drain should be checked before initial start-up and at the 
beginning of each cooling season to assure that the drain 
trap and riser are clear. If it is clogged, steps should be taken 
to clear the debris so that condensate will flow easily.

Periodic checks of the drain should be made during the 
cooling season to maintain a free-flowing condensate. 

Should the growth of algae and/or bacteria be a concern, 
consult an air conditioning and refrigeration supply 
organization familiar with local conditions for chemicals or 
other solutions available to control these agents.

23

Modular Hi-Rise Series Fan Coils

INSTALLATION, OPERATION, & MAINTENANCE MANUAL

Содержание MAY

Страница 1: ...ls Ideal for educational hospitality multi family or other commercial environments Designed for ducted applications Nominal CFM range of 600 to 3 000 CFM Modular Hi Rise Series Fan Coils INSTALLATION OPERATION MAINTENANCE MANUAL Modular Hi Rise Models MPY MXY MAY MBY Ditto MMY MSY MUY and MGY ...

Страница 2: ...each product may be changed without notice and may not be as described herein Please contact IEC for information regarding current design and product specifications Statements and other information contained herein are not express warranties and do not form the basis of any bargain between the parties but are merely IEC s opinion or commendation of its products Manufacturer s standard limited warr...

Страница 3: ... Knockout Locations Typical 16 Supply Air Installation 17 Demolition 18 Installation SECTION III Finishing Installation All Models 18 Grille Ductwork Installation 18 Outside Air Installation if required 18 Electrical Connections 19 Exposed Unit Touch up and Repainting 19 Concealed Unit Enclosure SECTION IV Start up All Models 20 Operating Conditions 20 Cooling Heating System 20 Air System Balancin...

Страница 4: ... damage or injury in the event of a leak or component failure during testing Always protect adjacent flammable material when welding or soldering Use a suitable heat shield material to contain sparks or drops of solder Have a fire extinguisher readily available The manufacturer assumes no responsibility for personal injury or property damage resulting from improper or unsafe practices during the h...

Страница 5: ...the straight and square cabinet alignment The unit must be lowered into the space taking care to properly align the risers to engage the riser swaged sections on the unit below The risers should never be bent or pushed together to be passed through the floor slot and should never be lifted up or pulled down to meet the risers on the floor below or above The risers are designed with a three inch sw...

Страница 6: ...lled on the Return Air side of the cabinet MUY Cabinet Return Air HR CR D HS CS HR CR D HS CS HR CR D HS CS D CR HS CS HR R D S HR Hot Water Return HS Hot Water Supply D Drain CR Cold Water Return CS Cold Water Supply R Return D Drain S Supply 2 or 4 pipe Figure 1 Unit orientation is determined based on the location of the risers in the building The riser side of the Universal Modular unit always ...

Страница 7: ...full length of the knockout 7 Use adhesive or glue to re attach insulation that has pulled away from the unit during knockout removal process CAUTION Toxic residues and loose particles resulting from manufacturing and field piping techniques such as joint compounds soldering flux and metal shavings may be present in the unit and the piping system Special consideration must be given to system clean...

Страница 8: ...ust be in vertical alignment Variations in floor to floor dimensions may require field work such as cutting off or extending the risers This operation is the responsibility of the installer The riser joint filler material must be selected to withstand the total operating pressure both static and pumping head to which the system will be subjected Low temperature lead alloy solders such as 50 50 and...

Страница 9: ...n lbs to prevent leaks 9 Locate the p trap drain and rubber hose factory installed to the drain pan connection in the bottom of the unit as shown in Figure 9 10 Push the rubber drain hose over the riser drain stubout Be careful that you do not bend the drain stubout 11 Adjust the hose clamp over the riser stubout and rubber hose to hold in place as shown in Figure 9 12 Test for leaks Any and all l...

Страница 10: ... piece Be careful of sharp edges 8 Use a sharp retractable knife to trim any excess insulation using knockout hole as pattern Unit Wall Unit Insulation 90 Duct Flange Figure 11 9 Use duct pliers hand seamers to fold duct flange out of the unit 90 for each side of the supply air opening along duct break see Figure 10 The 90 flanges can now be used as drywall stops to prevent coverage of discharge o...

Страница 11: ...iamese Ditto Fan Coil Care should be taken however not to penetrate the supply or return water risers or internal piping Given the levelness of the floor and or the fan coil assembly some shimming may be necessary Assemble the specified wall construction up to and over the top of the fan coil unit C see Figure 15 With the fire wall separation being complete the drywall skin on the surface of the i...

Страница 12: ...lable from the factory riser end caps air vents and or flushing loops are normally provided on the job by the installer Proper riser installation and vertical positioning in the unit provides for a unit piping run out to the service valves which are centered in the access slots and level or sloping down slightly away from the riser This prevents condensation from running back to the riser and poss...

Страница 13: ...oring the unit it is then ready for the various service connections such as riser joints and electrical At this time it should be verified that the proper types of service are actually provided to the unit On those units requiring chilled water and or hot water the proper main size and water temperature should be available to the unit The electrical service to the unit should be compared to the un...

Страница 14: ...ob site Risers must be anchored to the building structure to limit riser expansion and contraction movement to a maximum of 3 Riser anchoring and expansion compensation is not included in the factory supplied unit and must be field provided While some special riser features are available from the factory riser end caps air vents and or flushing loops are normally provided on the job by the install...

Страница 15: ...vent it from bending or twisting during installation as shown in Figure 19 Be careful to not over tighten swivel connections CAUTION Hose connection torque requirements are 350 in lbs 10 0 in lbs to prevent leaks 6 Locate the unit s coil fitting 7 The plastic flare caps on the end of the coil fitting should be removed and discarded 8 Use a wrench to tighten the swivel connections The baffle acts a...

Страница 16: ... and the hoses Variations in floor to floor dimensions may require field work such as cutting off or extending the risers This operation is the responsibility of the installer The riser joint filler material must be selected to withstand the total operating pressure both static and pumping head to which the system will be subjected Low temperature lead alloy solders such as 50 50 and 60 40 are nor...

Страница 17: ...rilles should be installed in accordance with the project plans and specifications If not included on the unit or furnished from the factory supply and return grilles should be provided as recommended in the product catalog Outside Air Installation if required Units provided with outside air for ventilation should have some form of low temperature protection to prevent coil freeze up This protecti...

Страница 18: ... for the products being used To repaint the factory baked enamel the finish should be prepared by light sanding with 280 grit sand paper or 000 or 0000 fine steel wool The surface may also be wiped with a liquid surface etch cleaning product such as No Sand or Pasceo These items should be available at most paint product stores It should be noted that the more conscientiously this preparation is do...

Страница 19: ...out dirt and debris which may have collected in the piping during construction During this procedure the system should be flushed from the supply riser to the return riser through a cross over loop at the end of the riser column and all unit service valves must be in the closed position This prevents foreign matter from entering the unit and clogging the valves and metering devices Strainers shoul...

Страница 20: ...tment after installation the control board settings for Low Medium and High could be adjusted by turning screws as shown in the picture using a small Phillips Screwdriver It will adjust the control voltage to the motor A clockwise rotation increases the voltage to the motor while counter clockwise rotation reduces it CAUTION Both of the procedures described below require the control box to be powe...

Страница 21: ...er the proper system operation is established the appropriate system operating conditions such as various water temperatures and flow rates should be recorded in a convenient place for future reference Before and during water system balancing conditions may exist due to incorrect system pressures which may result in noticeable water noise or undesired valve operation After the entire system is bal...

Страница 22: ...coil fins from the leaving air face This should again be followed by vacuuming Units provided with the proper type of air filters replaced regularly will require less frequent coil cleaning Electric Resistance Heater Assembly Electric resistance heaters typically require no normal periodic maintenance when unit air filters are changed properly The operation and service life may be affected by othe...

Страница 23: ... furnished from or recommended by the factory Pleated media or extended surface filters should not be used since the high air pressure drops encountered with these types of filters are not compatible with the type of fan coil unit covered in this manual Consult the factory for applications using filter types other than the factory standard or optional product Filters Permanent A maintenance schedu...

Страница 24: ...rial number 3 Unit hand connection right or left hand 4 Complete part description including any numbers On warranty replacements in addition to the information previously listed the unit shipping code which appears on the upper right hand corner of the serial plate is required Contact the factory for authorization to return any parts such as defective parts replaced in warranty All shipments retur...

Страница 25: ...ections Install ductwork fittings and grilles as required Flexible duct connections at unit Proper supply and return grille type and size Control outside air for freeze protection Insulate all ductwork as required Electrical Connections Refer to unit wiring diagram Connect incoming power service or services Install and connect furnish only parts Unit Start up General visual unit and system inspect...

Страница 26: ...he event of a breach of the Limited Express Warranty IEC will only be obligated at IEC s option to repair the failed part or unit or to furnish a new or rebuilt part or unit in exchange for the part or unit which has failed If after written notice to IEC s factory in Oklahoma City Oklahoma of each defect malfunction or other failure and a reasonable number of attempts by IEC to correct the defect ...

Страница 27: ...This page was intentionally left blank ...

Страница 28: ...I100 90001407 IOM 051 Revision 9 2 2018 2015 2018 International Environmental Corporation IEC PO Box 2598 Oklahoma City OK 73101 2598 P 405 605 5000 F 405 605 5001 www iec okc com Modular Hi Rise Series Fan Coils INSTALLATION OPERATION MAINTENANCE MANUAL IEC Modular Hi Rise IOM Part Number I100 90001407 IOM 051 Revision 9 2 2018 2015 2018 International Environmental Corporation IEC ...