Mash Bath
I N D U S T R I A L E Q U I P M E N T & C O N T R O L P T Y . L T D .
6 1 - 6 5 M c C l u r e S t . T h o r n b u r y . 3 0 7 1 M e l b o u r n e . A u s t r a l i a
T e l : 6 1 ( 0 ) 3 9 4 9 7 2 5 5 5 F a x : 6 1 ( 0 ) 3 9 4 9 7 2 1 6 6
E m a i l : i e c @ i e c p l . c o m . a u
M A S H B - 2 0 1 9 0 3 1 4 . d o c 1 4 - M a r - 1 9
1 4
STIRRING OPTIONS:
Normally the dry sample is not stirred during the preheat period
and, after the distilled water has been added to the sample and GO has been pressed to
cancel the HALT, the stirring begins and continues. The choices for stirring at any step
are: YES. NO, INT, IoB.
•
YES means constantly stirring at the speed set in the “maintenance screen” …
usually 400 RPM.
•
NO means no stirring at all.
•
INT means intermittent stir and the timing of the ON / OFF can be set in the “stirring
screen”.
•
IoB means the correct special stirring required to run the IoB program. 30 seconds
stir and 10 minutes no stir.
“COOL DISTILLED WATER” feature:
For floor models with distilled water tanks, during high production times, sometimes it
become useful to cool down the distilled water quickly, to be ready for the next mash. The
COOL D/W permits the starting of the cooling process before the mash program is
completely finished. An extra step is created with COOL D/W set to YES.
PROGRAMS ALREADY INSTALLED:
When supplied, several selectable programs are
already installed in the machine. When in the SELECTION display, one program must be
selected by the arrow buttons and, if the bath and d/w are full of water, the selected
program can be ENTERED. If the bath and d/w are not full, a program cannot be entered
to run. A message appears to advise this condition. In floor mounting models, the d/w
tank also must be full before entering a program.
The selected program is always shown on any display together with the program’s step
number controlling the temperature and time relationships. When the program is running,
the GRAPH of the program and the moving cursor line can be seen as the program steps
proceed.
As supplied, the following programs are present in the controller but at any time program
names can be changed and any step in any program can be altered to suit requirements:
Program #1: EBC extraction
Program #2: Hartong index extraction
Program #3: EBC Diastase Power.
Program #4: AAL test, cold water added intermittently to keep bath cool.
Program #5: IoB extraction, intermittent stir on/off.
Program #6: Fermentability extraction
Program #7: Spare
Program #8: Spare
The following pages take you through each display and provide
information about each one.