Cabinet Heater G*Y/D*Y Series

INSTALLATION, OPERATION, & MAINTENANCE MANUAL

12

SECTION ONE — Installation, Cont'd.

 

If coil and valve package connections are to be made 
with a “sweat” or solder joint, care should be taken to 
assure that no components in the valve package are 
subjected to a high temperature which may damage 
seals or other materials. Many two-position electric 
control valves, depending on valve operation, are 
provided with a manual opening lever. This lever 
should be placed in the “open” position during all 
soldering or brazing operations.

 

Ground-Joint seal preparation for copper unions 
(recommended by manufacturer):

1.  Make sure the ground joint area is free of 

nicks and scratches.

2.  Spray the ground-joint area with silicone 

spray for beeswax to enhance seating.

3.  Recommended torques for ground joint seal:
 

½” (nominal) unions – 35 ft./lbs. (minimum)

 

¾” (nominal) unions – 60 ft./lbs. (minimum)

4.  Make sure alignment of line does not put 

lateral stress on the ground-joint seal.

5.  Make sure that excess solder droplets do not 

reach the ground-joint area.

 

If the valve package connection at the coil is made with 
a union, the coil side of the union must be prevented 
from twisting (“backed up”) during tightening to 
prevent damage to the coil tubing. Over-tightening 
must be avoided to prevent distorting (“egg shaping”) 
the union seal surface and destroying the union.

 

The supply and return connections are marked on 
the coil stub-outs and the valve package, with an “S” 
meaning supply or inlet and “R” meaning return or 
outlet indicating flow direction to and from the coil. 
Red letters mark the hot water connections. 

1.  For DXY and DBY units, factory provides tube 

extensions to penetrate the rear of the fan coil 
cabinet. Hot extension tubes must be properly 
insulated.

Hydronic Heating Connections

After mounting the unit, it is then ready for the various 
service connections such as water and electrical. At this 
time, it should be verified that the proper types of services 
are actually provided to the unit. On those units requiring 
hot water, the proper line size and water temperature 
should be available to the unit. 

CAUTION: Toxic residues and loose particles 

resulting from manufacturing and field piping 

techniques such as joint compounds, soldering flux, and 

metal shavings may be present in the unit and the 
piping system. Special consideration must be given to 
system cleanliness when connecting to solar, domestic 
or potable water systems.

Submittals and product literature detailing unit operation, 
controls, and connections should be thoroughly reviewed 
BEFORE beginning the connection of the various cooling 
and/or heating mediums to the unit.

1.  Auxiliary Drain Pan

 

An optional auxiliary drain pan is available for coil 
draining.

 

The auxiliary drain pan is shipped loose from the 
factory and must be installed directly below the coil 
drain. 

 

The auxiliary drain pan is situated to the inner-case 
leg by way of either supporting tabs extending from 
the case leg or by way of slots in the case leg. The 
drain pipe or a drain trap is then connected to the 
stub-out off the bottom of the pan. Confirm that the 
pan is secure and positioned for proper operation.

2.  Valve Package Install (when applicable)

 

NOTE: Always protect hot water valve bodies, 

strainers, ball valves, and other flow control related 

devices from heat caused by soldering or brazing 
processes by wrapping these devices in cold or 
damp rags.

 

All accessory valve packages should be installed as 
required, and all service valves should be checked for 
proper operation.

Содержание G Y Series

Страница 1: ...ATION MAINTENANCE MANUAL Vertical Horizontal Vertical floor or wall mounted for concealed or exposed applications Horizontal ceiling for exposed or partially exposed applications Hot water coils steam...

Страница 2: ...of its products International Environmental Corporation IEC works continually to improve its products As a result the design and specifications of each product may be changed without notice and may no...

Страница 3: ...placement Parts SECTION FIVE Equipment Start Up 32 Check List IMPORTANT 33 Terms and Conditions SECTION ONE Installation 4 Preface 4 Unpacking and Inspection 5 Prepare Jobsite and Units 5 Handling and...

Страница 4: ...pressures as shown on unit rating plate Always pressure test with an inert fluid or gas such as clear water or dry nitrogen to avoid possible damage or injury in the event of a leak or component fail...

Страница 5: ...uired 3 Perform Dry Fit of valve assembly that may be shipped unattached to unit coil assembly Should any questions arise on fit up please contact your local representative immediately Handling and In...

Страница 6: ...t and recessed units have removable front panels to allow access to the unit Hydronic Heat units have either right or left hand piping Reference piping locations by facing the front of the unit airflo...

Страница 7: ...48 1219 06 55 1397 53 1346 08 55 1397 60 1524 10 77 1956 74 1880 12 77 1956 83 2083 Table 2 Horizontal Ceiling Coil Removal Minimum Service Clearance Width 12 18 in see table 2 28 in 28 in Figure 4 D...

Страница 8: ...he floor is able to support the weight of the unit See submittal drawings for nominal unit weight 3 Ensure wall behind unit is smooth and plumb if necessary install furring strips on walls with irregu...

Страница 9: ...t into the wall of the conditioned areas They cover the recess opening on all sides and are easily removed for access to the unit A top bottom and side framing studs are required to properly secure th...

Страница 10: ...ies INSTALLATION OPERATION MAINTENANCE MANUAL 10 SECTION ONE Installation Cont d Figure 8 Style W Framed Wall Panel Install Diagram Figure 9 Style Z Framed Wall Panel Style Z Figure 10 Style Z Framed...

Страница 11: ...ing the mounting points provided with 3 8 all thread rod and other hardware not supplied with unit The unit must be positioned so that the coil or electric heat elements are on a LEVEL PLANE Other fie...

Страница 12: ...penetrate the rear of the fan coil cabinet Hot extension tubes must be properly insulated Hydronic Heating Connections After mounting the unit it is then ready for the various service connections suc...

Страница 13: ...n accordance with the project specifications This is the responsibility of the installing or insulation contractor Electrical Connections The electrical service to the unit should be compared to the u...

Страница 14: ...g codes and ordinances Any modification of the unit wiring without factory authorization will void all of the factory warranties and will nullify any agency listings The manufacturer assumes no respon...

Страница 15: ...om the factory supply and return grilles should be provided as recommended in the product catalog For units with no return air ductwork check local code requirements for possible application restricti...

Страница 16: ...ected to verify that all systems are complete and properly installed and mounted and that no debris or foreign articles such as paper or drink cans are left in the units or other areas Clean dirt dust...

Страница 17: ...struction During this procedure all unit service valves must be in the closed position This prevents foreign matter from entering the unit and clogging the valves and metering devices Strainers shoul...

Страница 18: ...ould not be attempted by unqualified personnel The system must be complete and all components must be in operating condition BEFORE beginning water system balancing operations Each hydronic system has...

Страница 19: ...N8 Line Service Voltage 9 CN9 PSC Motor Connection 10 CN10 ECM Connection 11 ECM Fan Speed Adjustment 12 Ground Connection 13 LED Diagnostics for Multimeter Diagnostics 85 Control Board E025 71481108...

Страница 20: ...ed IEC 24V Thermostat Does not apply to proportional or Line voltage thermostat controls The diagram below represents a factory installed IEC 24V thermostat Connection Function Description 10V Not use...

Страница 21: ...sor RAS Room air sensor 2 CN2 Changeover Return Air Sensor l Power connector for 24V or Common powered sensors m 24V powered sensors l Applicable for IEC supplied air sensor for Wi Fi E055 71520330 Pr...

Страница 22: ...ontact factory for applications l CLG or HTG LED indication when either 1st stage cooling or heating activated 7 CN7 Class II Transformer l 40VA 75VA option l 24V LED activated when powered 8 CN8 Inco...

Страница 23: ...low Adjusting the potentiometers requires the use of a Multi meter capable of measuring 0 5 vdc 1 Only trained and qualified individuals should attempt to adjust or service components on any electrica...

Страница 24: ...flow for 0 10 VDC If a factory provided thermostat or DDC controller is utilized then the unit is already correctly configured Eco 2 Variable Airflow for 0 10 VDC No control board is required and no f...

Страница 25: ...C is applied to HTG that control signal will passively be present at Pin 8 of the CN6 connector HTG LED shows GREEN Signal for 1st stage cooling valve present G Fan Low Speed 24VAC LOW 24VAC signal ap...

Страница 26: ...es INSTALLATION OPERATION MAINTENANCE MANUAL 26 SECTION THREE Controls Operation Cont d Example Wiring Diagram Electric Heat Only NOTE Wiring diagram also available through QR code found on the unit s...

Страница 27: ...INSTALLATION OPERATION MAINTENANCE MANUAL 27 SECTION THREE Controls Operation Cont d Example Wiring Diagram 2 Pipe Hydronic Heat Only NOTE Wiring diagram also available through QR code found on the un...

Страница 28: ...he assembly require more extensive service the motor blower assembly may be removed from the unit to facilitate such operations as motor or blower wheel housing replacement etc Dirt and dust should no...

Страница 29: ...uous operation With proper unit application and operation the high limit thermal cutout will not operate This device only operates when a problem exists and ANY condition that causes high limit cutout...

Страница 30: ...e recorded in the log for each unit Refer to the product catalog for the recommended filter size for each product type and size If the replacement filters are not purchased from the factory the filter...

Страница 31: ...ification 1 Complete unit model number 2 Unit serial number 3 Complete part description including any numbers For warranty parts inquiries in addition to the information previously listed a descriptio...

Страница 32: ...illed water line size to unit Proper hot water line size to unit All services to unit in code compliance All shipping screws and braces removed Unit protected from dirt and foreign matter Heating Conn...

Страница 33: ...the event of a breach of the Limited Express Warranty IEC will only be obligated at IEC s option to repair the failed part or unit or to furnish a new or rebuilt part or unit in exchange for the part...

Страница 34: ...Cabinet Heater G Y D Y Series INSTALLATION OPERATION MAINTENANCE MANUAL 34 This page intentionally left blank...

Страница 35: ...Cabinet Heater G Y D Y Series INSTALLATION OPERATION MAINTENANCE MANUAL 35 This page intentionally left blank...

Страница 36: ...Series INSTALLATION OPERATION MAINTENANCE MANUAL Contact your local IEC Sales Representative for further details and pricing applicable to this product Visit our website iec okc com to find your local...

Отзывы: