(C) IDM ENERGIESYSTEME GMBH
Installation instructions Hygienik 2.0
23
Installing the hot water station 2.0
Ch
a
p
te
r 05
5.2. Installing the hot water station on the Hygienik
Hot water stations 25 l - 70 l 2.0 are mounted on the
Hygienik 2.0 on the construction site.
The hot water stations are installed on the Hygienik
2.0 using the tank connecting set provided.
The tank connecting set comprises two corrugated
stainless steel hoses and the corresponding threaded
fi
ttings.
The hot water station is connected at sockets 1 and
2 using the corrugated hoses. Mounts, as shown
above, are provided for installation of the hot water
stations. The holder for the hot water station must be
fi
xed on the mounts by two delivered screws. The hot
water station is hooked into the holder must be
fi
xed
with the third included screw below.
Socket 1
Socket 2
Mount
Stainless steel corrugated hoses
Fit the Arma
fl
ex insulation supplied over the corrugat-
ed hoses before connecting them to the Hygienik 2.0.
Connection at the top with Arma
fl
ex insulation
Connection at the bottom with Arma
fl
ex insulation
Holder for the installation on the
Hygienik and on the wall