![iDM HYGIENIK 2.0 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/idm/hygienik-2-0/hygienik-2-0_installation-instruction_3718206021.webp)
(C) IDM ENERGIESYSTEME GMBH
Installation instructions Hygienik 2.0
21
Installation
Ins
tall
a
tio
n
Once the insulation jacket has been installed,
fi
t the
cover to the top of the Hygienik. The cover consists
of two parts. First,
fi
t the smaller part with the
fl
eece
insulation facing inward. Then
fi
t the larger part with
the plastic side facing outward. Refer to the photos on
the left side of this page.
The scope of delivery includes plugs,
fl
eece material
and polystyrene caps to cover and insulate the con-
nections that are not used. Fit these as required. We
recommend that you insulate and cover connections
that are not used, as this can reduce heat losses.
Plug
Polystyrene covers
Insulating material made of
fl
eece