(C) IDM ENERGIESYSTEME GMBH
Installation instructions Hygienik 2.0
3
6. I
NSTALLATION
LAYOUTS
36
6.1. Explanation of symbols and notes on the installation layouts
36
6.2. List of installation layouts
37
6.2.1. TERRA SW Complete HGL + Hygienik 2.0 + direct heating circuit S4.2-0-2-0-0
38
6.2.2. TERRA SW Co Hygienik 2.0 + 3 heating circuits S4.1-0-1-0-0
39
6.2.3. TERRA SW Complete HGL + Hygienik 2.0 with LSP + circulation S4.2-0-1-0-1
40
6.2.4. TERRA SWM HGL + Hygienik 2.0 + Termo + 1 HC + Passive cooling S2.2-0-2+5-1-0
41
6.2.5. AERO ALM + Hygienik 2.0 with separatin plate + circulation L7.1-0-1-0-1
42
6.2.6. AERO ALM + Solar 12 m
2
+ Hyginik 2.0 with separating plate + 1 HC L7.1-6-3-0-0
43
6.2.7. TERRA AL 60 Max + Hygienik 2.0 + Termo L5.1-1-2+5-0-0
44
7. H
EATING
WATER
45
7.1. Heating water quality
45
7.2. Thermal inhibition of heating water
45
7.3. Treatment of the water in the heating system
45
7.4. Repairs
46
7.5. For existing systems
46
7.6. Filling and draining
46
7.7. Venting
46
7.8. Cleaning and decalcifi cation intervals
46
7.9. Cleaning and decalcifi cation
46
8. A
PPENDIX
47
8.1. CE - Declaration of Conformity
47
Contents