4. Installation
Installation instructions Hygienik 2.0
20
Ins
tall
a
tio
n
4. Installation
The iDM Hygienik 2.0 should be installed as close as
possible to the drinking water tapping points to keep
water lines as short as possible and avoid the need
for a circulation line.
During storage, transport and installation of the
equipment, it must be ensured that it is not subjected
to mechanical forces such as warping, scratches and
tension.
4.2. Installation location of the Hygienik
2.0
The iDM Hygienik 2.0 must be installed in a frost-
proof room by a licensed specialist
fi
rm. The pertinent
laws, regulations and standards both for boiler house
pipework and drinking water installations must be
observed.
Minimum distances required for installation and ser-
vicing work must be observed based on the speci
fi
c
installation situation, the routing of pipework and the
size of the installation room.
4.3. Connecting sockets of the Hygienik
2.0
In order to avoid heat losses, openings are not pro-
vided for all sockets in the insulation jacket. Additional
connections can be used by breaking open the rel-
evant perforations.
The insulation jacket and the hood must
not be exposed to intense sunlight or other
heat sources. There is a risk of damage to
the insulation and the surface.
To prevent corrosion inside the tank, follow
the instructions with regard to the heating
water!
By selecting a decentralized position for
the hot water stations near the tapping
points (e.g. inside the residential units),
the content of the hot water pipes can be
reduced to under 3 l.
Do not use abrasive or cleaning solutions
containing solvents to clean the high-gloss
front of the insulation. Thereby, the surface
can become brittle and it comes to crack-
ing. Such damages are excluded from the
warranty.
4.1. Installation conditions for the Hygienik 2.0
pic.: Cracks in the hig-gloss front of the insulation
caused by solvent-based cleaners.
pic.: Damaged insulation caused by improper stor-
age.