THE
ENERGY
FAMILY
(C) IDM Energiesysteme GmbH
General description
Installation instructions TERRA AL Twin
20
1
2
3
4
Placement and Installation
P
lac
ement
a
n
d
In
sta
lla
tion
4.14. Foundation construction
The ground must be a
fi
rm and level surface. It is possible to install concrete bases or other good bearing
components. The load capacity must be guaranteed.
The air source heat pump have to be positioned at least 20 cm higher the the surrounnding area.
If the base is lower than the expected snow level, the suction must be kept free of snow snowfall.
The maximum length of the hydraulic interconnections between Hygienik or heating buffer
and heat pump must not exceed 35 m. Please note when planing the position of the concrete
base.
view from above
897 (925)
1923 (1950)
378
71
134
630
210
285
607
1778
hydraulic and electrical
connections
condensation
outlet
The condensation run off and the hydraulic and electric connections are located on the rear
(air inlet) of the heat pump.
Dimensions in mm
Values in parenthesises shows dimensions
including the heat pump top.