![Idex Trebor QA1V208P12-AA Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/idex/trebor-qa1v208p12-aa/trebor-qa1v208p12-aa_operation-and-maintenance-manual_617826012.webp)
PAGE 12
QUANTUM DI HEATER OPERATION / MAINTENANCE MANUAL
2.5.f Machine Start-Up with door open
Perform the following sequence of events in the order listed for electrical
re-energization of the tool:
1.
Ensure that all hand tools are removed from the equipment and that it
is ready for start-up.
2.
Notify personnel in the area that you are going to start-up the
equipment.
3.
Insert and rotate the key in the rotary disconnect lock (top left of
rotary disconnect device). Remove the key.
4.
Move the rotary disconnect shaft to the "ON" of “1” (up) position.
5.
Press the machine start button. The machine should start.
2.6 SEISMIC PROTECTION
It is the use
r’s responsibility to adequately secure and anchor the
equipment to comply with local regulatory agency seismic requirements.
Mechanical anchors are provided using seismic brackets attached to the
bottom of the cabinet enclosure. See Facility Layout in Appendix for
bracket location.