
PAGE 22
MAGNUM 620D PUMP OPERATION / MAINTENANCE MANUAL
•
Install fittings and transfer tubes. See Figure 4-8.
•
Reconnect both air supply and fluid lines.
Figure 4-8
4.9 TESTING
Performance Test
•
With the air supply at 0 psi open the air supply valve
•
Increase the air pressure until the pump starts to cycle
•
Record the start pressure, Target = less than 30psig
•
Pump must prime and even cycling must be achieved
•
Increase pressure to 60 psi and allow pump to run for 5 minutes
•
Check for fluid leaks, listen for air leaks, and check for irregularity
•
Prepare the pump for drying
Dry Pump
•
Connect vacuum hose to discharge line
•
Connect purge line to fluid inlet
•
60 psig Supply Pressure
•
Cycle pump & vacuum dry by rotating pump side to side for 30 seconds.
•
Turn off Air Supply and allow the pump to purge for 5 minutes.
Dry Suction
•
40 psig Supply Pressure Target
•
Record Suction Value
•
Target = >8 in-Hg.