40
Table 4. Recommended Preventive Maintenance – CONTINUED
Interval
Check/Test
Action Required
Item(s) Required
Annually (Every 12 Months)
NOTE 1/ Calibrate
Verify foam flow calibration and water
flow calibration.
(Reference FSG-MNL–00186 and see
the Flow Calibration paragraph.)
Supply of clean water
Acceptable Foam
Flowmeter
Autolube Oil Check Check Autolube oil level and condition, if
required drain and refill with new oil
(See Table 5 for manuals reference and
reference Check Autolube Oil Level para-
graph.)
1/4-in Allen Wrench
Shop Rags
1 qt of EP 90, 80W-90
Oil Change
Drain oil from gearbox and refill with new
oil (See Table 5 for manuals reference
and reference Oil Change Procedure par-
agraph.)
Gear Oil Required Varies
By Pump Model
See Table 5
Perform NFPA
1911 Performance
Level Tests
Check the pump at each capacity and
compare the results to when the pump
was first placed in service.
Supply of clean water
Bi–Annually (Every 24 Months)
Change Pump Seal
(ONLY If Packing
Style)
Replace Complete Pump Seal (ONLY if
Packing Style) (See Table 5 for manuals
reference and see Packing Seal Change
paragraph.)
Refer to pump manual
NOTE 1/: Only required if SmartFoam or SmartCAFS equipped.
NOTES:
Refer to Operation Installation Maintenance Manual (FSG-MNL–00210), Pre-
ventive Maintenance for instructions to perform SAM preventive maintenance
tasks.
Refer to applicable pump Technical Manual (see Table 5) for instructions to
perform the pumps required preventative maintenance.
Table 5. Pump Preventive Maintenance Cross References
Pump
Manual Reference
Midship Pumps
Qmax
FSG-MNL-00200
Qmax-XS
Qflo
Qtwo
8F
(8FG, 8FK, or RME *)
Single Stage Booster Pumps
RSD
FSG-MNL-00184
* RME not currently covered.
Содержание Hale Sam
Страница 2: ......
Страница 37: ...17 Figure 14 SAM Blue CAN Buss Architecture With Three SAM Control Centers Diagram...
Страница 38: ...18 Figure 15 SAM Green CAN Buss Architecture With Three SAM Control Centers Diagram...
Страница 39: ...19 Figure 16 SAM Red CAN Buss Architecture With Three SAM Control Centers Diagram...
Страница 40: ...20 Figure 17 SAM System Drain And Pneumatic Diagram...
Страница 41: ...21 Figure 18 SAM Speaks Diagram...
Страница 42: ......
Страница 58: ...38 THIS PAGE INTENTIONALLY BLANK...
Страница 62: ...42 THIS PAGE INTENTIONALLY BLANK...
Страница 192: ...172 THIS PAGE INTENTIONALLY BLANK...
Страница 206: ...186 THIS PAGE INTENTIONALLY BLANK...
Страница 220: ...200 THIS PAGE INTENTIONALLY BLANK...