26
Viscount GTS -
Installation & Servicing
GTS 14:
Fit the water balancing diaphragm with the notches vertical
onto the boiler return with a ø 170 x 222 gasket in between
(first soak the gasket in warm water).
Fit the heating return flange with a ø 170 x 222 gasket in
between and fix it with four M18 nuts.
•
GTS 14 - 15 :
Place the nozzle turned outside from the boiler with a ø
170 x 222 gasket in between (first soak the seal in warm
water).
Assemble the flange with angled piece so that the angle
is turned upward, with a ø 170 x 222 gasket in between
(first soak the gasket in warm water) and fasten with four
M18 nuts.
•
GTS 16 - 25 :
Assemble the flange with angled piece so that the angle
is turned upward, with a ø 170 x 222 gasket in between
(first soak the gasket in warm water) and fasten with four
M18 nuts.
Carefully insert the ø 15 gasket in the groove of the rear
section and hold it in place with a few drops of silicone.
L
VIS9164
Package
FA68 - 14 sections
GTS14
Package
FA49 - 14 sections
GTS15-25
Package
FA50 to FA 60
GTS 15 - GTS 25 :
Fit the water balancing tube onto the boiler return with a ø170 x
222 gasket in between (first soak the gasket in warm water),
using four M18 nuts.
Fit the heating return flange with a ø 170 x 222 gasket in
between (first soak the gasket in warm water) and fix it with
four M18 nuts.
VIS9165
GTS 14 - GTS 15
Package FA 49 to FA 50
GTS 16 - GTS 25
Package FA 51 to FA 60
VIS5093
Boiler
L
Type
(mm)
GTS 15, 16
380
GTS 17-19
600
GTS 20-22
880
GTS 23-25
1210
32 ASSEMBLING THE RETURN FLANGE ON BOILERS GTS 14-25
33 FITTING THE BOILER OUTLET
FLANGE GTS 14 - GTS 25
34 FITTING THE BOILER OUTLET
FLANGE
INST
ALLA
TION
Содержание Viscount GTS 14
Страница 50: ...50 Viscount GTS Installation Servicing NOTES...
Страница 51: ...51 Viscount GTS Installation Servicing NOTES...