IDEAL SUPER PLUS 200/S Скачать руководство пользователя страница 24

24

Super Plus  -  

Installation and Servicing

FAULT FINDING

MODULE 'MAINS ON' LIGHT NOT 

ILLUMINATED 

Check that:

i)   External fuses are intact and that the external controls are 

calling for heat.

ii)   There is mains electrical supply (230V) at both S3 terminals 

on PCBs 10 and 11 in the wiring centre (see Fig.14 ), and that 

the wiring centre fuses and connections are sound.

iii)  All connections are sound in the module multipin plug and in the 

control box; there is mains electrical supply (230V) at terminals 

2 and 4 in the multipin plug (Fig.14)

Replace parts (as appropriate) PCBs 11, 10, 15 or 9.

FAN DOES NOT START

Check that:

i)  Module thermostat is calling for heat. Note that at any particular 

time the return water temperature may be higher than the 

individual  module  thermostat  setting;  module  is  not  out  on 

overheat if so press in overheat reset button and see Fault 

Finding No.8)

ii)  There Is electrical continuity between the brown and blue 

pressure switch connections (note that these wires carry 230V); 

pressure and suction lines and connections are sound.

ill) There is mains electrical supply (230V) to the fan motor and  

that fan impeller is free to rotate (note that the fan motor is fitted 

with a thermal trip, so if impeller is jammed, free it and allow 

time for the motor to cool)

iv)  Connections are sound in the control box
Replace parts (as appropriate) fan motor, PCB 9B, pressure switch 

and thermostat sensor.

IGNITION SEQUENCE DOES NOT START

Check that:-

i)  The normal boiler operation is that where no modules are firing, 

all module fans will start and run for a minimum of 70 seconds 

and  then,  depending  on  the  module's  position  in  the  firing 

sequence, the fan will stop for a delay varying between 0 second 

and 35 seconds, after which the fan will run for approximately a 

further 35 seconds. Only then will the ignition sequence start.

ii)  The 'lockout' light is not illuminated: if it is wait for 15 seconds 

and then press in and release the lockout reset button.

iii)  All connections are sound at the control box and the pressure 

switch, and that the fan is operating.

iv)  The pressure switch differential pressure is >5.5 mb. If not check 

the fan impeller, cast venturi, pressure and suction lines, burner, 

module heat exchanger or flue for blockage or leakage.

v)  There is electrical continuity between the blue and black 

pressure switch connections (note that these wires carry 230V)

vi)  The flame probe circuit has not shorted to earth. Replace parts 

(as appropriate). Pressure switch, flame probe, PCBs 9B and 

12.

FAULT FINDING

F

AUL

T FINDING

NO SPARK AT IGNITION ELECTRODE 

Check that:

i)  The ignition electrode and lead are sound and that all 

connections are clean and tight and there is no arcing anywhere 

but at the spark gap.

ii)  The electrode spark gap is 3.5 ± 0.5 mm (Fig.l7)

iii)  There is mains electrical supply (230V) at the spark generator 

at the correct time during the ignition sequence (Fig. 19)

Replace parts (as appropriate) spark generator, ignition electrode 

and feed or PCBs 13, 12, or 9B

MAIN BURNER DOES NOT STAY ALIGHT

Check that:

i)  The pilot flame detector current is approximately 6µA by 

breaking the inline connector in the flame detector lead and 

inserting a micro-ammeter.

ii)  That all connections are sound in the control box and flame 

detector lead.

iii)  The flame detector and electrode is sound and correctly 

connected.

Replace parts (as appropriate) flame detector electrode and flyaway 

lead,  flame  detector  lead,  PCBs  13,  12  or  9B  or  main  burner 

complete with pilot pipe.

MAIN BURNER DOES NOT LIGHT

Check that:

i)  Main burner pressure is 2.7 mbar, and that main burner injector 

is clean and undamaged.

ii)  There is mains electrical supply (230V) at both main gas valves 

and that both gas valves are open.

iii)  There is a minimum dynamic gas inlet pressure available.
Replace parts (as appropriate) main gas governor, main gas valves, 

PCBs 12 or 9B or main gas injector.

MODULE OUT ON OVERHEAT

Check that:

i)  Water temperature difference across module when it is firing 

is 10 - 12

o

C.   Adjust water flow rate as necessary.

ii)  Main thermostat sensor is pushed fully home in its pocket and 

is secured with its retaining clip.

iii)  Overheat thermostat is operating at  its correct setting of 100

o

C.

Replace parts (as appropriate) overheat thermostat, control 

thermostat sensor, control thermostat potentiometer or PCB 9B.

Содержание SUPER PLUS 200/S

Страница 1: ...n be assured conform to the safety and performance speci cation that we require Do not use reconditioned or copy parts that have not been clearly authorised by Ideal For the very latest copy of litera...

Страница 2: ...Plus Installation and Servicing CAUTION To avoid the possibility of injury during the installation servicing or cleaning of this appliance care should be taken when handling edges of sheet steel comp...

Страница 3: ...tment products which must be used in accordance with the manufacturers instructions For further information contact Fernox Fry Technology UK Tandem House Marlowe Way Beddington Farm Road Croydon CRO 4...

Страница 4: ...of Each Module kg 69 2 69 2 69 2 69 2 69 2 69 2 69 2 lb 152 5 152 5 152 5 152 5 152 5 152 5 152 5 Weight of Water Header kg 16 3 38 2 38 2 49 8 49 8 49 8 49 8 lb 36 84 2 84 2 109 8 109 8 109 8 109 8...

Страница 5: ...f BS 5978 and will occur whenever the boiler goes from a situation of no modules firing to a situation of one module firing This includes morning start up and those occasions of low load when the last...

Страница 6: ...box assembly 2 Fan motor 3 Venturi and gaskets 4 Pressure switch 5 Pressure switch test connections 6 Overheat thermostat pocket 7 Water flow elbow 8 Gas inlet flange 9 Cast iron top cover plate 10 C...

Страница 7: ...ulations Failure to install appliances correctly could lead to prosecution It is in your own interest and that of safety to ensure the law is complied with In addition the installation must comply wit...

Страница 8: ...er house or compartment may be used provided that specialist advice is taken and that the combustion air and ventilation requirements of the boiler is provided in line with BS 6644 In addition this bo...

Страница 9: ...t comply with British Gas requirements refer P7 and IM 11 All dimensions in mm in Note The discharge from both types of system MUST not allow recirculation of combustion products into the boilerhouse...

Страница 10: ...5 600 6 boilers only SUPER PLUS 600 6 Boiler shown Note On 500 5 Module 1 is blanked off All dimensions in mm in Fig 9 BOILER DIMENSIONS SUPER PLUS 300 3 400 4 boilers only Note On 300 3 Module 1 is b...

Страница 11: ...connection 5 in flange connection All dimensions in mm in Fig 11 Module Arrangement Super Plus 300 3 alternative 5 in flange connection 5 in flange connection All dimensions in mm in Fig 12 Module Arr...

Страница 12: ...Executive Publication PM5 A minimum static head of 1 6 m is required to overcome the boiler hydraulic resistance and give a reasonable safety margin This requirement is specific to the boiler but ins...

Страница 13: ...y to comply with pump manufacturers requirements 3 The open vent height above tank water level cannot be guaranteed adequate in all circumstances and does not take into account any instantaneous chang...

Страница 14: ...vated by fire sensors Terminal S2 is voltage free If no other safety devices are to be used the water flow switch should be connected across S1 and S3 If all overriding safety devices are wired in ser...

Страница 15: ...by unscrewing its retaining screws Offer up the module to the casing so that the square cutout lugs on the rear end plates sit over the runners within the casing and push the module home Note Lift the...

Страница 16: ...boiler must be wired into the 3 way terminal block on the lower of the 3 wiring centres PCB No 11 on the left hand side of the boiler Terminals S1 S2 S3 allow safety devices to be wired directly into...

Страница 17: ...The draught stabiliser should be set to control between neutral and 0 2 mbar 0 08 in w g draught in the casing with one or all modules firing A test point is provided in the boiler casing adjacent to...

Страница 18: ...on the electrical supply The fan will run for 70 seconds and then for a further 35 seconds after a variable delay as previously described but at the end of this time the ignition sequence will not sta...

Страница 19: ...on the part should be replaced Check the spark gap it should be 3 5 0 5 mm Fig 18 HEAT EXCHANGER Inspect the dry side of the heat exchanger finned tubes via the burner opening using a torch and by rem...

Страница 20: ...ule from the boiler as previously described and remove all fittings from the module cast iron top plate 2 Remove the 16 x M10 screws and the 9 central M8 screws which secure the cast iron top plate to...

Страница 21: ...e flow elbow 2 Undo the 2 screws securing the 2 halves of the controls box and carefully lower the front half 3 Remove printed circuit board No 9B as described above 4 Pull off the 2 push on connectio...

Страница 22: ...proof washers Refit the wiring centre cover and secure with the 4 screws and washers Spark Generator 1 Pull the overheat thermostat coil retaining strip and split pin from the pocket in the flow elbow...

Страница 23: ...eration Flame proving Main burner Fan Pilot burner ignition can occur at any time during 4s spark ignition period 8s Spark ignition period Purge period approx 35s 4s Up to 35s Fans start in sequence w...

Страница 24: ...is operating iv The pressure switch differential pressure is 5 5 mb If not check the fan impeller cast venturi pressure and suction lines burner module heat exchanger or flue for blockage or leakage v...

Страница 25: ...nted Circuit Board Assembly PCB 9 44 013 241 Control Knob Bulgin 46 013 755 Control Thermostat Sensor 47 058 511 Control Termostat Potentiometer Assembly 49 134 713 Reset Switch Assembly 51 134 515 Sp...

Страница 26: ...26 Super Plus Installation and Servicing NOTES...

Страница 27: ...27 Super Plus Installation and Servicing NOTES...

Страница 28: ...st class training courses for domestic commercial and industrial heating installers engineers and system specifiers For details of courses please ring 01482 498432 Ideal is a trademark of Ideal Boiler...

Отзывы: