IDEAL SUPER PLUS 200/S Скачать руководство пользователя страница 12

12

Super Plus  -  

Installation and Servicing

WATER CIRCULATION SYSTEM

DESIGN REQUIREMENTS
SUPER PLUS

 Gas Boilers are intended for use in conjunction with 

FULLY PUMPED, OPEN VENTED OR PRESSURISED systems, 

subject to the requirements below. They are 

NOT SUITABLE

 for 

use on gravity circulation systems.

Water flow rate:

28.4  gal/min  (2.15  l/s)  ±  10%  through  each  module. Thus  a  6 

module boiler (

Super Plus 600/6

) requires 170.4 gal/min (12.9 

l/s) volume flow rate.

Note:Failure to maintain this flow rate will result in operation of the 

module overheat thermostat.

Any other method of installation should be discussed with Ideal 

Boilers before proceeding.

Hydraulic Resistance:

When  operating  at  the  correct  volume  flow  rate  given  above, 

the Hydraulic Resistance of all 

Super Plus 

boilers is 98 mb (39 

in.w.g.) ± 20%.

Pump Overrun:

A pump overrun time of 30 seconds minimum must be allowed for 

on plant shutdown.

Maximum Static Head:

60.0m (197 ft.), i.e. maximum operating pressure 6.0 bar (85 lb/in

2

).

Minimum Static Head

Minimum static head requirements for open vented systems must 

comply with boiler design characteristics, pump manufacturer's 

requirements and the requirements of the Health and Safety 

Executive Publication PM5.
A minimum static head of 1.6 m is required to overcome the boiler 

hydraulic resistance and give a reasonable safety margin. This 

requirement is specific to the boiler but installed systems must also 

comply with Health and Safety Executive Guidance Note PM5. In 

those cases with minimum static head available it will be necessary 

to fit a further overheat thermostat in the mixed flow from the boiler 

set at 90

0

C and wired to terminals S2 and S3 in the wiring centre.

Note:

  In some cases pump manufacturers will require a head 

as high as 12 m (40 ft), This must be allowed for the minimum 

head increase accordingly.

See Fig.14 for further clarification

1. Roof top or single storey applications

2. Ground floor or basement applications

System Zones

Minimum head 

required by boiler, 

but additional head 

may be required 

by the pump 

manufacturer 

or to comply 

with Health and 

Safety Executive 

Guidance Note 

PM5

All dimensions in mm (in.)

l

LEGEND
1.  Cold feed (size must 

comply with BS 6644)

2.  Open vent (size must 

comply with CP:332:3)

3.  Safety valve

4.  Water flow switch

5.  Dual primary pumps

6.  Mixing header

7.  Feed expansion tank

8.  Mixing valve

9.  Highest point in system

Fig.13 Guide to Minimum Requirements - Feed / expansion tank height & boiler primary circuit

HIGH

LEVEL

ZONE

MID

LEVEL

ZONE

HIGH  LEVEL ZONE

Super

Plus

Boiler

Super

Plus

Boiler

GENERAL

GENERAL

Содержание SUPER PLUS 200/S

Страница 1: ...n be assured conform to the safety and performance speci cation that we require Do not use reconditioned or copy parts that have not been clearly authorised by Ideal For the very latest copy of litera...

Страница 2: ...Plus Installation and Servicing CAUTION To avoid the possibility of injury during the installation servicing or cleaning of this appliance care should be taken when handling edges of sheet steel comp...

Страница 3: ...tment products which must be used in accordance with the manufacturers instructions For further information contact Fernox Fry Technology UK Tandem House Marlowe Way Beddington Farm Road Croydon CRO 4...

Страница 4: ...of Each Module kg 69 2 69 2 69 2 69 2 69 2 69 2 69 2 lb 152 5 152 5 152 5 152 5 152 5 152 5 152 5 Weight of Water Header kg 16 3 38 2 38 2 49 8 49 8 49 8 49 8 lb 36 84 2 84 2 109 8 109 8 109 8 109 8...

Страница 5: ...f BS 5978 and will occur whenever the boiler goes from a situation of no modules firing to a situation of one module firing This includes morning start up and those occasions of low load when the last...

Страница 6: ...box assembly 2 Fan motor 3 Venturi and gaskets 4 Pressure switch 5 Pressure switch test connections 6 Overheat thermostat pocket 7 Water flow elbow 8 Gas inlet flange 9 Cast iron top cover plate 10 C...

Страница 7: ...ulations Failure to install appliances correctly could lead to prosecution It is in your own interest and that of safety to ensure the law is complied with In addition the installation must comply wit...

Страница 8: ...er house or compartment may be used provided that specialist advice is taken and that the combustion air and ventilation requirements of the boiler is provided in line with BS 6644 In addition this bo...

Страница 9: ...t comply with British Gas requirements refer P7 and IM 11 All dimensions in mm in Note The discharge from both types of system MUST not allow recirculation of combustion products into the boilerhouse...

Страница 10: ...5 600 6 boilers only SUPER PLUS 600 6 Boiler shown Note On 500 5 Module 1 is blanked off All dimensions in mm in Fig 9 BOILER DIMENSIONS SUPER PLUS 300 3 400 4 boilers only Note On 300 3 Module 1 is b...

Страница 11: ...connection 5 in flange connection All dimensions in mm in Fig 11 Module Arrangement Super Plus 300 3 alternative 5 in flange connection 5 in flange connection All dimensions in mm in Fig 12 Module Arr...

Страница 12: ...Executive Publication PM5 A minimum static head of 1 6 m is required to overcome the boiler hydraulic resistance and give a reasonable safety margin This requirement is specific to the boiler but ins...

Страница 13: ...y to comply with pump manufacturers requirements 3 The open vent height above tank water level cannot be guaranteed adequate in all circumstances and does not take into account any instantaneous chang...

Страница 14: ...vated by fire sensors Terminal S2 is voltage free If no other safety devices are to be used the water flow switch should be connected across S1 and S3 If all overriding safety devices are wired in ser...

Страница 15: ...by unscrewing its retaining screws Offer up the module to the casing so that the square cutout lugs on the rear end plates sit over the runners within the casing and push the module home Note Lift the...

Страница 16: ...boiler must be wired into the 3 way terminal block on the lower of the 3 wiring centres PCB No 11 on the left hand side of the boiler Terminals S1 S2 S3 allow safety devices to be wired directly into...

Страница 17: ...The draught stabiliser should be set to control between neutral and 0 2 mbar 0 08 in w g draught in the casing with one or all modules firing A test point is provided in the boiler casing adjacent to...

Страница 18: ...on the electrical supply The fan will run for 70 seconds and then for a further 35 seconds after a variable delay as previously described but at the end of this time the ignition sequence will not sta...

Страница 19: ...on the part should be replaced Check the spark gap it should be 3 5 0 5 mm Fig 18 HEAT EXCHANGER Inspect the dry side of the heat exchanger finned tubes via the burner opening using a torch and by rem...

Страница 20: ...ule from the boiler as previously described and remove all fittings from the module cast iron top plate 2 Remove the 16 x M10 screws and the 9 central M8 screws which secure the cast iron top plate to...

Страница 21: ...e flow elbow 2 Undo the 2 screws securing the 2 halves of the controls box and carefully lower the front half 3 Remove printed circuit board No 9B as described above 4 Pull off the 2 push on connectio...

Страница 22: ...proof washers Refit the wiring centre cover and secure with the 4 screws and washers Spark Generator 1 Pull the overheat thermostat coil retaining strip and split pin from the pocket in the flow elbow...

Страница 23: ...eration Flame proving Main burner Fan Pilot burner ignition can occur at any time during 4s spark ignition period 8s Spark ignition period Purge period approx 35s 4s Up to 35s Fans start in sequence w...

Страница 24: ...is operating iv The pressure switch differential pressure is 5 5 mb If not check the fan impeller cast venturi pressure and suction lines burner module heat exchanger or flue for blockage or leakage v...

Страница 25: ...nted Circuit Board Assembly PCB 9 44 013 241 Control Knob Bulgin 46 013 755 Control Thermostat Sensor 47 058 511 Control Termostat Potentiometer Assembly 49 134 713 Reset Switch Assembly 51 134 515 Sp...

Страница 26: ...26 Super Plus Installation and Servicing NOTES...

Страница 27: ...27 Super Plus Installation and Servicing NOTES...

Страница 28: ...st class training courses for domestic commercial and industrial heating installers engineers and system specifiers For details of courses please ring 01482 498432 Ideal is a trademark of Ideal Boiler...

Отзывы: