SERVICING
Mini
--- Installation & Servicing
44
61 PRIMARY HEAT EXCHANGER
REPLACEMENT
1 Disconnect the electrical supply.
2 Remove outer and inner casing as explained in frame 36.
3 Close off the isolating cocks of the CH circuit at the
bottom of the boiler.
4 Release system pressure by opening the main circuit
drainage cock.
Do not release CH pressure using the pressure relief
valve. It may cause debris within the system to foul
the valve.
5 Remove the combustion chamber panel A by unscrewing
the screws B. For models
Mini C28
,
Mini S28
and
Mini
C32
only, remove the screw C and the plate D.
6 Remove the clips E and the safety thermostat F. It is not
necessary to disconnect it from the wiring.
A
B
E
D
F
C
7 Unscrew the locknut G, lift the pipe H and rotate it right
then move it downwards freeing it from the heat
exchanger connection.
8 Completely unscrew the connection I
9 Move the pipe J downwards freeing it from the heat
exchanger connection.
G
H
I
J
10 Remove the heat exchanger by sliding it forwards.
11 Re---assemble in reverse order.
SER
VI
CI
N
G
Содержание MINI C24
Страница 2: ...2 Mini Installation Servicing...