background image

 

32

 

INsTaLLaTION

Indep Combi - 

Installation and Servicing

32  haNDINg OVER

7.  Draw attention to the timer Users Instructions and hand them 

to the householder.

8.  Loss of system water pressure

 

Explain that the dial underneath the boiler indicates the 
central heating system pressure and that if the normal 
COLD pressure of the system is seen to decrease over a 
period of time then a water leak is indicated. Explain the re-
pressurising procedure and if unable to re-pressurise or if the 
pressure continues to drop a registered local heating installer 
should be consulted.

9.  Explain Boiler reset procedure.

10. After installation and commissioning please complete 

the  

 Commissioning Checklist before 

handover to the customer. For IE, its is necessary to 
complete a “Declaration of Conformity” to indicate compliance 
to I.S. 813:2002.

IMpORTaNT

11. A comprehensive service should be carried out ANNUALLY.

 

Stress the importance of regular servicing by a Gas Safe 
Registered Engineer. In IE servicing work must be carried out 
by a Registered Gas Installer (RGII).

12. Inform the householder of the guarantee/registration found 

within the envelope pack and the requirement to register it to 

receive the full benefit of the warranty.

1.  Hand the User Instructions to the householder and 

explain his/her responsibilities under the relevant national 
regulations.

2.  Explain and demonstrate the lighting and shutting down 

procedures.

3.  The operation of the boiler and the use and adjustment of all 

system controls should be fully explained to the householder, 
to ensure the greatest possible fuel economy consistent with 
the household requirements of both heating and hot water 
consumption.

 

Advise the User of the precautions necessary to prevent 
damage to the system and to the building, in the event of the 
system remaining inoperative during frosty conditions.

4.  Explain the function and the use of the boiler heating and 

domestic hot water controls.

 

Explain that due to system variations and seasonal 

temperature fluctuations DHW flow rates/temperature 

rise will vary, requiring adjustment at the draw off tap.  It 
is therefore necessary to draw the users attention to the 
section in the Users Instructions titled “Control of Water 
Temperature” and the following statement:

 

“additionally, the temperature can be controlled by the 
user via the draw-off tap: the lower the rate the higher 
the temperature, and vice versa”
.

5.  Explain the function of the boiler fault mode.

 

Emphasise that if a fault is indicated refer to “Fault Codes” in 
the User Guide.

6.  Explain and demonstrate the function of time and 

temperature controls, radiator valves etc., for the economic 
use of the system.

after completing the installation and commissioning of the system the installer should hand over to the householder by 
the following actions:

31  REsET pROCEDURE

To reset boiler, turn the mode control knob (D) to reset position and immediately turn knob back to required setting.  The boiler will 
repeat the ignition sequence if a heat demand is present.

Legend

a.  Pre-heat On/off
B.  DHW temperature control
C.  CH temperature control

A

B

E

F

C

D

D.  Off/Summer/Winter/Reset Control
E.  Boiler Status
F.  Burner ‘on’ indicator

IN

s

T

a

LL

a

TION

Содержание INDEPENDENT C35

Страница 1: ...STALLATION AND SERVICING Independent Combi C24 C30 C35 For details of document amendments refer to page 3 For users guide see reverse of book When replacing any part on this appliance use only spare p...

Страница 2: ...nt Combi Installation and Servicing U n i t 3 A T h o r n t o n R o a d I n d E s t a t e O f f H o c k n e y R o a d B r a d f o r d B D 8 9 H Q 0 1 2 7 4 4 8 8 3 8 8 w w w h e a t i n g s p a r e s...

Страница 3: ...he ideal installer helpline 01482 498704 NOTE BOILER RESET PROCEDURE To reset boiler turn mode knob to reset position and immediately turn knob back to required setting The boiler will repeat the igni...

Страница 4: ...designed for connection via ducts to a horizontal or vertical terminal which admits fresh air to the burner and discharges the products of combustion to the outside through orifices which in this cas...

Страница 5: ...back page Page Burner operating pressure n a Central heating flow temp measure and record Central heating return temp measure and record For combination boilers only Scale reducer 12 Hot water mode He...

Страница 6: ...rise The DHW draw off rate specified above is the nominal that the boiler flow regulator will give Due to system variations and seasonal temperature fluctuations DHW flow rates temperature rise will v...

Страница 7: ...invalidate the certification and the normal appliance warranty It could also infringe the Gas Safety Regulations and the above regulations SAFE HANDLING OF SUBST ANCES No asbestos mercury or CFCs are...

Страница 8: ...n Spacing 1 Directly below above or alongside an opening window air vent or other ventilation opening 300mm 12 2 Below guttering drain pipes or soil pipes 25mm 1 BS5440 1 2008 75mm 3 3 Below eaves 25m...

Страница 9: ...e minimum boiler heat output should be achieved using a room thermostat whilst other rooms are individually controlled by thermostatic radiator valves However if the system employs thermostatic radiat...

Страница 10: ...less than the length of flue required the flue must be fitted from the outside Installation from inside ONLY b If a core boring tool is to be used inside the building the space in which the boiler is...

Страница 11: ...e connection is only allowed if acceptable to the local water authority b Antifreeze fluid corrosion and scale inhibitor fluids suitable for use with boilers having aluminium heat exchangers may be us...

Страница 12: ...s is maintained in accordance with the manufacturer s instructions 2 If the boiler is installed in an existing system any unsuitable additives MUST be removed by thorough cleansing BS 7593 2006 detail...

Страница 13: ...CTOR ASSEMBLY 214 VENTURI 215 FAN 217 BURNER 218 GASKET BURNER 219 SUMP CLEAN OUT COVER 223 FLUE MANIFOLD 224 FLUE MANIFOLD TOP 227 CLAMP RETAINING FLUE TURRET 228 HOSE CONDENSATE INTERNAL 229 SIPHON...

Страница 14: ...or non telescopic flue assembly for rear or side flue outlet in Pack B is suppled as a separate order Unpack and check the contents Pack A Contents A Boiler B Hardware Bag C Wall Mounting Plate D The...

Страница 15: ...inal Wall Seal D Cutting Aid Note This flue system incorporates a removable flue outlet nose that utilises a push fit location system This enables the installation of deflector high level or balcony o...

Страница 16: ...se damage or personal injury 1 Cut the flue hole preferably with a 5 core boring tool ensuring that the hole is square to the wall Both wall faces immediately around the cut hole should be flat 2 Dril...

Страница 17: ...ith a screw cap seal and a lower air sample point with an air stopper seal Ensure all caps seals are in place Additional Termination Kits available for use with these B packs Flue Deflector Kit The re...

Страница 18: ...0mm long B Pack Telescopic Cut 75mm Minimum Maximum Minimum Maximum Minimum Maximum Minimum Maximum B Pack Standard 171 556 286 484 601 816 526 741 Plus 1 1m D pack 1121 1506 1236 1434 1551 1766 1476...

Страница 19: ...holes in the outer flue section into the inserted outer flue as shown Take care not to pierce the inner plastic flue Fit screw provided 5 Seal the joint on the outer air duct with the tape provided 6...

Страница 20: ...tted 7 Ensure the seam and the outlet terminal are at the top and fitted as shown Note If less than 50 of the length of the flue is internal the flue should be fitted from outside Fitting the Turret 1...

Страница 21: ...cessories Flue Duct Extension Kits are available for flue lengths extending beyond 1m These packs contain 1m extension ducts and may be cut to the desired length If the offset vertical option is used...

Страница 22: ...nal Position Minimum Dimension Directly below an opening air brick windows etc 300 mm Below plastic painted gutters 300 mm Painted surface 300 mm Below eaves or balcony 500 mm Below velux windows 2000...

Страница 23: ...ure the vertical connector by applying downward pressure on the connector 4 Position the clamp on the top face of the flue manifold and push it horizontally backwards Locate both clamp lugs into the f...

Страница 24: ...only be considered after exhausting all internal termination options as described previously An external system must terminate at a suitable foul water discharge point or purpose designed soak away If...

Страница 25: ...ensate trap Min 19mm Internal pipe Min 30mm Internal pipe Water weather proof insulation 75 Boilers without 75mm sealed condensate trap must be fitted with a 75mm trap and visible air break Visible ai...

Страница 26: ...not create a hazard to the occupants of the premises or damage the electrical components and wiring FILLING Important when filling A Ensure the dust cap on air vent located at the rear of the pump cha...

Страница 27: ...ed 24 electrical connections Wiring should be 3 core PVC insulated cable not less than 0 75mm2 24 x 0 2mm and to BS 6500 Table 16 For IE reference should be made to the current ETCI rules for electric...

Страница 28: ...3 5 4 1 2 3 1 2 1 2 1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 Water Pressure Sensor Water Flow Turbine Fan Flow Thermistor Return Thermistor Flame Sensor Electrode Spark Electrode Spark Generator p...

Страница 29: ...aving checked That the boiler has been installed in accordance with these instructions The integrity of the flue system and the flue seals as described in the Flue Installation section Proceed to put...

Страница 30: ...turned off 2 Refit the boiler front panel Refer to Frame 34 3 Check that the drain cock is closed and that the CH and DHW isolating valves M L and G are OPEN 4 Check that the electrical supply is OFF...

Страница 31: ...should read neon flashing then neon steady when the burner lights 2 Close all taps except the furthest one from the boiler and check that the boiler is firing at maximum rate This is factory set to gi...

Страница 32: ...economy consistent with the household requirements of both heating and hot water consumption Advise the User of the precautions necessary to prevent damage to the system and to the building in the eve...

Страница 33: ...carried out in sequence Important 6 After completing the servicing or exchange of components always test for gas tightness 7 When work is complete the front panel MUST be correctly refitted ensuring...

Страница 34: ...f necessary 1 2 3 5 Injector REMOVAL 1 Loosen the two screws retaining the front panel 2 Pull the two spring clips down to disengage and pull panel forward and upward and remove REPLACEMENT 3 Hook the...

Страница 35: ...t the burner is not placed down upon its face as this may cause damage to the ceramic 6 Brush off any deposits that may be on the ceramic with a SOFT brush 7 Inspect the sealing gasket around the burn...

Страница 36: ...on Electrode Flame Detection Reassemble the boiler in the following order 1 Ensure that the condensate trap siphon is full of water 2 Refit the burner ensuring the sealing gasket is correctly position...

Страница 37: ...onnect the electrical leads from the fan 3 Undo the gas pipe union connection to the injector housing 4 Remove the extended nut retaining the fan mounting bracket 5 Lift and remove the fan and venturi...

Страница 38: ...ration of the boiler Refer to Frames 29 30 2 4 3 6 43 burner REPLACEMENT 5 5 6 1 See Frame 39 2 Refer to Frame 40 3 Undo the two screws and remove the sump cover 4 Lift the manifold to clear the botto...

Страница 39: ...30 44 return thermistor reNEW AL 1 Refer to Frame 40 2 Unclip the return thermistor from the return pipe and withdraw it from the boiler 3 Disconnect the electrical lead from the thermistor 4 Reconne...

Страница 40: ...r to Frames 29 30 Flame Detection Electrode Spark Generator 12 5mm Straight edge 1 Refer to Frame 40 2 Remove the burner Refer to Frame 43 3 Unplug the flame detection lead from the electrode 4 Remove...

Страница 41: ...the two sealing washers are in place and reconnect gas and electrical connections 7 Check operation of the boiler Refer to Frames 29 30 49 diverter valve actua tor replacement 1 Refer to Frame 40 2 R...

Страница 42: ...te Boiler Chip Card BCC to it this should correspond to the output of the boiler 24kW 30kW or 35kW Note Ensure the correct orientation of BCC by placing TOP side up as shown 8 Re connect all plug conn...

Страница 43: ...o be in vertical position PCB 4 1 Remove the boiler front panel Refer to Frame 34 2 Pull out the plate with timer attached 3 Disconnect 5 way connector 4 Remove programmer and fit new programmer 5 Re...

Страница 44: ...essurise as appropriate 5 Check operation of the boiler Refer to Frames 29 30 CENTRAL HEA TING CIRCUIT 1 Refer to Frame 40 2 Close all the CH water isolating valves on the boiler inlet 3 To drain the...

Страница 45: ...r and remove pipe Refer to Frame 57 5 The automatic air vent head is retained in the pump body with a bayonet connection The air vent head and float assembly is removed by turning the head anti clockw...

Страница 46: ...ock clear of the boiler 8 Unscrew the rear cartridge connection 9 Fit the new valve mechanism ensuring the correct fit of the pin 10 Reassemble in reverse order 11 Refill the boiler 12 Check operation...

Страница 47: ...iler Refer to Frames 29 30 6 4 64 DHW Filter DHW Flow Regula tor Cleaning Replacement DHW Filter 1 Refer to Frame 40 2 Isolate the mains cold water supply to the boiler 3 Drain the boiler DHW circuit...

Страница 48: ...8 8 Remove the expansion vessel Refer to Frame 67 9 Remove the flow thermistor Refer to Frame 65 10 Remove the 2 M5 screws retaining the gas valve mounting bracket and transfer bracket to the new heat...

Страница 49: ...k pressure to 0 75 bar 4 Re assemble in reverse order 5 Check operation of the boiler Refer to Frames 29 30 REPLACEMENT 6 Refer to Frame 40 7 Drain the boiler CH circuit Refer to Frame 55 8 Unscrew th...

Страница 50: ...associated harness for continuity visual condition and position Refer to Frame 45 Are these functioning correctly NO Check siphon and condensate drain pipe work for blockage and rectify if necessary...

Страница 51: ...integrity of internal boiler wiring RESET PROCEDURE To reset boiler turn mode knob to reset position and immediately turn knob back to required setting 71 aLTERNA TING L AND 5 5 resets within 15 mins...

Страница 52: ...ectly yes Check siphon and condensate drain pipe work for blockage and rectify if necessary Boiler now working OK Check wiring from gas valve to PCB for continuity If the wiring is OK then replace the...

Страница 53: ...wires to the outside sensor Check the resistance using a suitable multimeter connected across the Outside Sensor s terminal pins At 0 o C expect 31 000 35 000 Ohms At 15 o C expect 15 000 16 500 Ohms...

Страница 54: ...the Flow Thermistor no 79 aLTERNA TING F AND 9 PCB Fault Replace PCB Ensure that the BCC boiler chip card small plastic part is fitted to the PCB otherwise replace PCB 81 aLTERNA TING c AND 2 BCC faul...

Страница 55: ...ion yes no Move the mode knob to the Winter position Are the Timer and the Room Thermostat switched on yes no Switch the Timer and Room Thermostat On Are the Radiator Valves Open yes no Open the Radia...

Страница 56: ...ame 2 Is the wiring between the PCB and the diverter valve motor connected yes yes Check diverter head fully engaged and clip secured onto waterset yes Is diverter stuck in the CH position yes Check a...

Страница 57: ...ehensive spares parts information and details of approved Ideal Parts Distributors are available on www idealparts com Our Parts team are also available to help with your Ideal Spare Parts enquiries o...

Страница 58: ...nt Combi Installation and Servicing U n i t 3 A T h o r n t o n R o a d I n d E s t a t e O f f H o c k n e y R o a d B r a d f o r d B D 8 9 H Q 0 1 2 7 4 4 8 8 3 8 8 w w w h e a t i n g s p a r e s...

Страница 59: ...guarantee the boiler needs to be registered with the manufacturer within one month of the installation To maintain the boiler guarantee it is essential that the boiler is serviced annually by a Gas S...

Страница 60: ...as BOILER sysTEM COMMIssIONINg ChECKLIsT CONTROLs Programmable room thermostat Optimum start control Combination Boiler Fitted Fitted Fitted Automatic bypass to system Fitted Boiler interlock aLL sysT...

Страница 61: ...VICE RECORD sERVICE 01 aND Where Possible aND Signature sERVICE 02 aND Where Possible aND Signature sERVICE 03 aND Where Possible aND Signature sERVICE 04 aND Where Possible aND Signature sERVICE 05 a...

Страница 62: ...the correct type as specified by BS 7967 Prior to its use the ECGA should have been maintained and calibrated as specified by the manufacturer The installer must have the relevant competence for use o...

Страница 63: ...that no seals e g Those on flue extensions have been displaced during installation Rectify if necessary Turn off appliance and call Ideal Technical helpline for advice The appliance must not be commi...

Страница 64: ...domestic commercial and industrial heating installers engineers and system specifiers For details of courses please ring 01482 498 432 Manufactured under an ISO 9001 registered quality management sys...

Страница 65: ...and performance specification that we require Do not use reconditioned or copy parts that have not been clearly authorised by Ideal For installation guide see reverse of book U n i t 3 A T h o r n t o...

Страница 66: ...bove regulations In IE the installation must be carried out by a Registered Gas Installer RGII and installed in accordance with the current edition of I S 813 Domestic Gas Installations the current Bu...

Страница 67: ...to a maximum of 80o C adjustable via the CH temperature control C The Independent Combi is a high efficiency combination boiler which is most efficient when operating in condensing mode The boiler wil...

Страница 68: ...rom a watering can or similar DO NOT use boiling water 3 Caution when using warm water as this may freeze and cause other localised hazards 4 Once the blockage is removed and the condensate can flow f...

Страница 69: ...ING SWITCHING TIMES Set tappets to outer edge for ON periods and set tappets to inner edge for OFF periods The example shown has been set with 2 on periods ON at 9 00am OFF at 1 00pm 13 hours ON at 6...

Страница 70: ...and adjust if necessary Check the timer is in an ON position and the room thermostat is turned up NO HOT WATER OR CENTRAL HEA TING Check the fused spur is turned on and ensure switch mode control knob...

Страница 71: ...e boiler has a call for hot water but the appliance has reached the desired temperature set on the boiler The boiler is operating in central heating mode The boiler is operating in pre heat mode The b...

Страница 72: ...sure gauge If the boiler fails to operate then please contact Ideal if under warranty or alternatively a Gas Safe Registered Engineer if outside of the warranty period In IE contact a Registered Gas I...

Отзывы: