background image

9

 

Installation & Servicing

GENERAL

Detail reference should be made to the appropriate
standards listed on page 4.

The information and guidance given below is not
intended to override any requirements of the above
publications or the requirements of the local authority,
gas or water undertakings.

The vertical distance between the pump and feed/
expansion cistern MUST comply with the pump
manufacturer's minimum requirements, to avoid
cavitation.  Should these conditions not apply either
lower the pump position or raise the cistern above the
minimum requirement specified by Caradon Ideal
Limited
.  The isolation valves should be fitted as close
to the pump as possible.

The boiler is fitted with an automatic air vent.  This air
vent must never be shut off, as this could result in dry
firing of the boiler and subsequent damage to the heat
exchanger.

The information provided is based on the following
assumptions:

1. An independent open vent/safety pipe connection is

made immediately after the system flow pipe
connection.

2. An independent cold feed/expansion pipe

connection is made immediately after the open
vent/safety pipe connection.

3. The maximum flow rate through the boiler is based

on a temperature difference of 11ºC at full boiler
output.

4. The boiler is at the highest point of circulation in the

system.  Systems designed to rise above the boiler
flow tappings will automatically require a minimum
static head higher than that shown.

5. The position of the open vent/safety pipe above the

expansion cistern water level is given as a guide
only.  The final position will depend upon the
particular characteristics of the system.  Pumping
over of water into the expansion cistern must be
avoided.

6. Both open vent/safety pipe and cold feed/expansion

pipes must be of adequate diameter to suit the
output of the boiler.  Refer to Tables 4 and 5.

3

OPEN VENTED SYSTEM REQUIREMENTS

Rated output

Minimum bore

Nominal Size (DN)'

kW

mm

61 to 150

32

32

151 to 300

38

40

  'Steel pipe sizes complying with medium or heavy quality or
  BS 1387.

Table 4 Open Vent Pipe Sizes

Rated output

Minimum bore

Nominal Size (DN)

kW

mm

in'

61 to 150

25

1

151 to 300

32

1

/

4

'Steel pipe sizes complying with medium or heavy quality or
BS 1387.

Table 5 Cold Feed Pipe Sizes

Note.

Refer to Frames 23 and 24 for typical system arrangements.

Feed/expansion

cistern

Open vent
safety pipe

3 m 
minimum
see notes

System
flow

Inverted cold
feed entry

Cold

Feed

Water

level

(cold)

Open vent

System
return

Connections

to boiler

ima 5791

Note.

With a cold feed head of <8m, the pump must
be fitted on the return to the boiler.

This diagram does not show safety valves,
water flow switches, etc. necessary for the safe
operation of the system.

Содержание imax plus F80

Страница 1: ...D When replacing any part on this appliance use only spare parts that you can be assured conform to the safety and performance specification that we require Do not use reconditioned or copy parts that...

Страница 2: ...3 910 Btu ft3 nett at 15 C and 1013 25 mbar a For l s divide the gross heat input kW by the gross C V of the gas MJ m3 b For ft h3 divide the gross heat input Btu h by the gross C V of the gas Btu ft3...

Страница 3: ...g systems Fully pumped systems may be open vented or sealed The range of boilers is NOT suitable for 1 Gravity DHW systems 2 Gravity heating systems 3 Direct domestic hot water supply 4 Single feed in...

Страница 4: ...r conditioning If this should occur the appliance MUST be isolated from the gas supply labelled as unsafe until corrective action can be taken Terminal Position Due to the high efficiency of the boile...

Страница 5: ...rrent suitability should be confirmed directly with the manufacturer G E Betz Ltd Sentinal Division Foundry Lane Widnes Cheshire WA8 8UD Tel 0151 424 5351 or Fernox Manufacturing Co Ltd Cookson Electr...

Страница 6: ...GRAPH 1 WATER PRESSURE LOSS ima 5774 F80 F120 F160 20 C F 80 20 C F 120 11 C F160 11 C F 120 11 C F 80 20 C F 160 1300 1250 1200 1150 1100 1050 1000 950 900 850 800 750 700 650 600 550 500 450 400 350...

Страница 7: ...y are on the R H or on the L H side of the boiler see views on the left Flue connection shown on RH side options shown dotted at rear or left Model Modules No off A B Weight Connections ima 5773 The b...

Страница 8: ...ING CIRCUIT PRIMARY BOILER CIRCUIT ima 5790 The use of a mixing header means that compensating controls can be used to operate mixing valves on a variable temperature circuit without affecting the wat...

Страница 9: ...t 4 The boiler is at the highest point of circulation in the system Systems designed to rise above the boiler flow tappings will automatically require a minimum static head higher than that shown 5 Th...

Страница 10: ...alarms may be necessary Expansion vessels used must comply with BS 4814 and must be sized on the basis of the total system volume and initial charge pressure Initial minimum charge pressure should not...

Страница 11: ...TC Temperature Sensors 3 to 8 Overheat Thermostats 3 to 8 Burners 2 to 7 Aluminium Heat Exchanger 3 to 8 Sections Condensate Sump Flue Collector Box Boiler Frame Filling Up Elbow Min Depth 100 mm ima...

Страница 12: ...connections simply remove the blanking plates from the connection required and attach the flue air connections Seal off the unused connections with the removed blanking plates Note To enable cleaning...

Страница 13: ...IN A condensate drain for the boiler should be assembled as shown below This can be built using the parts provided plus other pieces not supplied The parts provided are 40mm plastic pipe All additiona...

Страница 14: ...rb the lip seal The flue should be supported in such a way as to not place a load on the flue manifold 14 ELECTRICAL CONNECTIONS Warning This appliance MUST be earthed A mains supply of 230V 50Hz is r...

Страница 15: ...hese terminals provide a 24V supply and return to be switched open closed circuit Open circuit enables the night time set back period If no night time set back period is required then a link wire shou...

Страница 16: ...e of providing the boiler with the actual stored DHW temperature allowing closer output matching and reduced cycling Use of a tank sensor kit cannot be timer controlled A diverting valve or a separate...

Страница 17: ...BROWN BLUE YEL GRE RED YEL GRE ORANGE RED BLUE BLUE GREEN GREEN WHITE RED BLUE BLACK BLUE BLACK BLUE BROWN FILTER GE FITELEC 1 YEL GREEN YEL GREEN YEL GREEN YEL GREEN CVI CONTROL MAIN SUPPLY 230 V 50...

Страница 18: ...ate required and the flow temperature required It can communicate directly with the CVI controls of 2 modules The AM 5 board is a supplementary board used with boilers containing more than 2 modules I...

Страница 19: ...F O N 1 2 O F F O N The Modular Boiler Drive MBD see Frame 20 for location manages to check a two burner group 2 x 40 80 kW For boilers with outputs greater than 80 kW 1 2 or 3 supplementary AM 5 boa...

Страница 20: ...rough a relay powers the 3 way valve thus closing port A and opening port B Simultaneously terminal 16 is energised which through another relay powers the primary system pump If PARA A 2nd digit is se...

Страница 21: ...Installed on the Secondary Circuit in Parallel with the Heating Circuit 1 2 4 3 5 76 ST O R E M O D E R ES ET ST EP 16 1718 11 12 13 ima 5783 Flow Return Filter Primary System Pump Mixing header non r...

Страница 22: ...n installer once he has entered the service code By pressing the mode key again DATA mode is displayed In this mode it is possible to read information on the operation of the boiler The following mode...

Страница 23: ...O R E M O D E R E S E T As above As above it selects parameters data all single test all single it chooses the mode It displays when in DATA mode It stores when in PARA mode it in creases or decreases...

Страница 24: ...sing mode S T E P S T O R E M O D E R E S E T it selects parameters data all single test all single it chooses the mod e It displays when in DATA mode It stores when in PARA mode it in creases or decr...

Страница 25: ...y 11 1 6 0 Maximum CH Flow Temperature Setpoint degC S T E P 30 90 80 3 8 0 Flow Temperature Minimum Design Setpoint degC Press Display Description Parameters accessible to trained installers and serv...

Страница 26: ...P E 2 0 Ignition fan speed of parameter C S T E P F 2 0 2nd Digit DHW type x0 3 way valve normally open to CH system x1 DHW pump x2 3 way valve normally open to DHW tank DO NOT ADJUST 58 DO NOT ADJUST...

Страница 27: ...ow temperature NTC1 C Local return temperature NTC2 C Module 4 fan speed set point rpm Module 4 actual fan speed rpm Local flow temperature NTC1 C Local return temperature NTC2 C Module 5 fan speed se...

Страница 28: ...emperature NTC2 C Module 6 fan speed set point rrpm xxxx Module 6 actual fan speed rpm xxxx Local flow temperature NTC1 C Local return temperature NTC2 C Module 7 fan speed set point rrpm xxxx Module...

Страница 29: ...burner module 3 Test mode low for burner module 3 Test mode off for burner module 4 Test mode high for burner module 4 Test mode low for burner module 4 S T E P A L L S T E P B U R 1 S T E P B U R 2 S...

Страница 30: ...nd closing the circuit connected across terminals 5 6 Without the outside sensor connected PARA 3 fixes the boiler set flow temperature If the outside sensor is connected automatic detection then the...

Страница 31: ...ws the building temperature to be dropped during periods e g night time The heating curve can be adjusted using the following parameters see also Frames 26 and 28 Parameter 3 Highest set flow temperat...

Страница 32: ...ON 4 Fill the condensate trap with water before putting the unit into operation see frame 11 for guidance 5 Check the indication on the pressure gauge sealed system installations If the pressure is l...

Страница 33: ...in a safe place for ready reference IMPORTANT Point out to the owner that the boiler must have regular maintenance and cleaning at least annually in order to ensure reliable and efficient operation Re...

Страница 34: ...it is checked at regular intervals and serviced as necessary The frequency of servicing will depend upon the installation condition and usage but should be carried out at least annually Caradon Ideal...

Страница 35: ...ssed air through the metal fibre side of the burner Do not brush the metal fibre side of the burner If they show any signs of damage they must be replaced 12 Inspect the heat exchanger some aluminium...

Страница 36: ...f the silicon tubes to the air pressure switch Measure the signal across the air pressure switch If greater than 53 Pa replace the air pressure switch If less than 53 Pa check the following Check for...

Страница 37: ...es are equivalent the code with the lowest first digit prevails in the case that the first digits are equivalent the code with the highest second digit prevails Error Code Description Alarm L1 2 Local...

Страница 38: ...ons The NTC and or wiring of the global temperature involved is defective Insufficient or even no circulation of water due to the obstruction of the sections or pump failure ERRORCODESRELATEDTOGLOBALT...

Страница 39: ...ir Vent 1 173 029 32 Global Flow Return Sensor T7335D1040 12K 2 173 038 32 Module Temperature Sensor 1 per Section T7335D1040 12K 5 to 8 173 038 1 Module Temperature O H Sensor 1 per Section T7335D104...

Страница 40: ...ent in the design and performance of its products The right is therefore reserved to vary specification without notice The Ideal Boilers Technical Training Centre offers a series of first class traini...

Отзывы: