![IDEAL DN50 Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/ideal/dn50/dn50_installation-manual_616798014.webp)
14
EVOMAX - Low Height Frame & Header Kits
6 ELECTRICAL CONNECTIONS
7 COMMISSIONING AND TESTING
1. Refer to the Installer Wiring Connection section in the boiler Installation Instructions for wiring details.
2. Ensure the boiler shunt pumps are wired to the boiler in order to ensure the boiler pump overrun facility is provided.
1. Electrical and gas safety checks must be carried out on completion of installation as with individual boiler
commissioning.
2. Pump setting adjustment. Follow instructions on pump type shown below;
Adjust red control potentiometer fully
clockwise to position 8, as shown below.
This is the constant pressure modulation
function.
Содержание DN50
Страница 15: ...15 EVOMAX Low Height Frame Header Kits ...