19
Concord Super Series 4 -
Installation & Servicing
14 BOILER ASSEMBLY - EXPLODED VIEW (300kW VERTICAL BOILER SHOWN)
DETAIL OF DRAIN ASSEMBLY
DETAIL OF GAS HEADER FLEXIBLE HOSES
LEGEND
1.
Flue sampling point
2.
Wiring centre
3.
Water header
4.
Gas pressure test point
5.
50kW module
6.
Module cover
Note.
M12 flange bolts must be fitted pointing away
from the module for the outer connections and pointing
towards the module for the inner connections.
ASSEMBLY
Содержание Concord Super Series 4 50 V
Страница 2: ......
Страница 39: ...37 Concord Super Series 4 Installation Servicing ...