background image

23

Concord CXS  -  

Installation & Servicing

LEGEND

1.

Main gas inlet cock.

2.

Gas inlet union.

3.

Gas control valve.

4.

'O' ring seal.

5.

Spark generator.

29 GAS CONTROL VALVE

SERVICING

31 BURNER AND CONTROLS ASSEMBLY - Exploded  View  - CXS 40 - 90

30 MAIN BURNER

1.

Disconnect the electrical connections to the faulty gas
valve.

2.

Turn the gas inlet cock OFF and unscrew the 4 screws
on the outlet flange then unscrew the 4 screws on the
inlet flange.

CXS 90 -120 only -

 loosen the other 4 screws on the inlet

flange securing the other gas valve.

3.

Fit the new valve and reassemble in the reverse order,
ensuring that the arrow on the back of the valve points in
the direction of the gas flow and that new 'O' ring seals
are correctly placed in each flange connection.

4.

Test for gas soundness.

5.

Recommission the appliance and set the manifold
pressures as described in Frames 22 and 23 or 24.

1.

Remove the NOx duct and burner front plate, as
previously described in Frame 26.

2.

On the 

CXS 40, 50 & 60

 remove the screws holding the

HT heat shield from the LH leg of the combustion
chamber.  Raise slightly and withdraw the heat shield,
taking care not to damage the leads.

3.

Each burner can be removed by sliding back, to clear the
injector, then lifting out.  Disconnect the ignition leads
from the LH burner and the detection lead from the RH
burner.

4.

Remove the 2 screws securing the electrode assembly
and heat shield  to the LH burner bracket and the 2
screws securing the detection electrode bracket to the
RH burner.

5.

Reassemble in reverse order.

IMPORTANT. 

 Care must be taken to prevent damage to the

combustion chamber insulation when replacing burners.

6.

Burner manifold.

7.

Main injector, 3 off.

8.

Main burner (centre/RH), 2 off.

9.

Main burner (LH), 1 off.

10.

Ignition electrodes.

11.

Overheat thermostat generator mounting bracket.

12.

Overheat thermostat.

13.

Detection electrode assembly.

14.

HT leads heat shield.

15.

Gas pipe.

PTP

Pressure test point.

SER

VICING

Содержание Concord CXS 40

Страница 1: ...tallers guide to commercial central heating boilers I N S TA L L AT I O N I D E A L I D E A L I D E A L I D E A L I D E A L M A N U A L T H E T H E T H E T H E T H E S E R V I C I N G Concord CXS 40 1...

Страница 2: ...cord CXS Installation Servicing CAUTION To avoid the possibility of injury during the installation servicing or cleaning of this appliance care should be taken when handling edges of sheet steel compo...

Страница 3: ...to ensure that the law is complied with The Concord CXS 40 120 range of boilers has been tested and certified by British Gas to prEN656 for use with Natural gas only Multiple boiler installations The...

Страница 4: ...7 Nett kW 28 4 33 8 40 6 47 5 54 4 61 4 67 6 74 0 81 0 Btu hr x 1000 97 0 115 3 138 5 162 5 185 6 209 5 231 7 252 5 276 4 Boiler Input Gross kW 52 5 62 5 75 1 87 93 100 7 113 5 125 0 137 4 149 8 Btu...

Страница 5: ...The mains voltage supply is via a terminal plug in connection at the control box OPTION KITS Remote Indication Kit This kit gives the facility of remote indication of boiler status Pressure Gauge Kit...

Страница 6: ...163 0 167 213 in 2 3 4 3 1 8 3 1 8 4 5 8 4 5 8 6 1 2 6 1 2 6 5 8 8 3 8 Table 4 POSITION OF BOILER Minimum clearances required from walls or other fixed objects to allow for the free access of combusti...

Страница 7: ...sitioned so that it pressurises the system being served The vertical distance between the pump s and any cold feed and expansion cistern MUST comply with the pump manufacturers requirements in order t...

Страница 8: ...ot Water Boilers 60kW to 2MW BS 6880 Pt1 3 Water Supply CP342 2 Centralised Hot Water Supply Model Water Bye laws Manufacturers notes must not be taken in any way as overriding statutory obligations T...

Страница 9: ...oilers and Air Heaters and the Third Edition of the 1956 Clean Air Act Memorandum should be strictly observed where applicable The chimney design should avoid the formation of excessive quantities of...

Страница 10: ...nout cover 2 Collector hood 3 Middle section 4 Section alignment rings O rings 5 End section 6 Gas cock 7 Drain cock 8 NOx duct 9 Front plate 10 Burner manifold assy 11 Base plate 12 Combustion chambe...

Страница 11: ...the front cross member on the packaging base 7 Remove the gas cock by unscrewing the union and screw in the handling bars into the 2 front tappings Protect the exposed inlet gas union from ingress of...

Страница 12: ...ther lower rear connection using the gasket and M10 x 25mm screws and washers provided 3 Temporarily screw the 2 handling bars 2 pipe into the top tappings and manoeuvre the boiler into position 4 Com...

Страница 13: ...2 Table 2 gives details of the inlet connection size and the minimum working pressures INSTALLATION INSTALLATION 12 CASING ASSEMBLY 1 Unpack the control box from its carton and release the temperatur...

Страница 14: ...through the cable clips as shown Ensure the phial is correctly seated in the correct pocket opposite side to the flow connection Refer to Frame 9 Secure with the split pin provided 8 Route the temper...

Страница 15: ...box is shown in Frame 15 Wiring should be in four core PVC insulated cable not less than 0 75mm2 24 0 2mm All fuses must be ASTA approved to BS 1362 The length of the conductor between the cord ancho...

Страница 16: ...16 Concord CXS Installation Servicing 15 INTERNAL WIRING v violet pk pink y gyellow green or orange y yellow w white br brown r red LEGEND b blue bk black INSTALLATION INSTALLATION W4115A1020 T2...

Страница 17: ...the valve for that zone When all thermostats are satisfied also when the clock period ends all relays will be off so the zone valves which were open will remain open for the pump overrun period 17 ZON...

Страница 18: ...s Any leaks must be cured Replace all pressure test point screws 18 ZONES WITH SPRING RETURN MOTORISED VALVES IMPORTANT Terminal L2 may control the appropriate pump s directly provided that the total...

Страница 19: ...ton 4 4 Switch on the electrical supply to the boiler 5 Ensure that all system controls time switch system controls etc are calling for heat 6 Turn the boiler thermostat knob 1 to position 6 20 INITIA...

Страница 20: ...ows CXS 40 90 Boilers Refer to Frame 20 illustration Numbers in brackets in this 40 90 section also refer to Frame 20 The location of the manifold pressure adjuster 8 on the gas valve is shown in Fram...

Страница 21: ...st have regular maintenance and cleaning at least annually in order to ensure reliable and efficient operation Regular attention will also prolong the life of the boiler and should preferably be perfo...

Страница 22: ...ctrode shield and base fixing screws are tight 2 The electrodes are correctly positioned Refer to Frames 31 or 32 3 Reassemble in reverse order Refit the flue baffles cleanout cover NOx duct and casin...

Страница 23: ...3 or 24 1 Remove the NOx duct and burner front plate as previously described in Frame 26 2 On the CXS 40 50 60 remove the screws holding the HT heat shield from the LH leg of the combustion chamber Ra...

Страница 24: ...lows 1 pink 2 white 3 red Reconnect the earth terminal 5 Reassemble in reverse order ensuring that the thermostat connections are facing front before fitting the top bracket and that the capillary goe...

Страница 25: ...4 Pull out the sensor plug from the PCB and remove the strain relief bush Remove the sensor and lead 5 Fit the new sensor in reverse order ensuring that the lead is routed along the casing in the clip...

Страница 26: ...its contents into a commercial tip 35A CONTROL SENSOR POTENTIOMETER ASSEMBLY 1 Undo the thermostat knob retaining screw and pull off the knob 2 Remove the lower front panel 3 Undo the backnut and wash...

Страница 27: ...ractice together with any relevant requirements of the local gas supplier and local authority TOOLS REQUIRED z Spanners z Torque wrench z Pozi screwdriver z Mallet ASSEMBLY The combustion chamber shou...

Страница 28: ...ms a hydraulic test should be carried out at 1 1 2 times the design pressure given in Table 2 for a period of 30 minutes 12 On a pressurised system the test should be at twice the design pressure for...

Страница 29: ...pump with a maximum current of 3A is connected to the boiler pump terminals pump overrun will be in operation when the demand for heat is satisfied and will continue to run for 6 minutes Frost protect...

Страница 30: ...generator Replace PCB S4561B1047 YES YES 44 BOILER LIGHTS BUT GOES TO LOCKOUT NO Measure the flame current expect approximately 3 5 A Replace PCB S4561B1047 Check RH burner inlet and burner pressure...

Страница 31: ...ELL VR4605AB 1019 CXS 100 120 1 111 869 29D Gas control valve plug and lead assemblies CXS 40 120 1 111 870 29E CXS 40 120 1 154 734 29F CXS 100 120 1 112 431 29G CXS 100 120 1 139 269 29H 30 Spark ge...

Страница 32: ...154 867 A02 Ideal Installer Technical Helpline 01482 498376 SHORT LIST OF PARTS Key No Description Qty Product No 48 RH casing side panel white stove enamel CXS 40 1 111 650 CXS 50 60 1 111 651 CXS 70...

Отзывы: