20
British Gas 100 & 125 RD2 -
Installation & Servicing
INSTALLATION
FLUE OUTLET
26 FITTING THE SIDE OUTLET PLATES
Note.
If the boiler is fitted closer than 25mm to the side wall
the side outlet plate must be fitted now.
1.
Split the side outlet plate into 2 down the split line.
2.
Fit the 2 halves of the side outlet plate to the wall,
ensuring they are behind the boiler sealing ring.
1.
Connect the flue terminal to the boiler,
using the length (A) of flue duct
previously cut and ensuring that the
inner flue locates into the kit extension
tube (without ring).
2.
Secure the flue to the boiler using the 2
M4 x 16mm screws previously
removed.
25 CONNECTING THE FLUE TO THE BOILER - Top (100 only)
(Supplied in the Flue Directional Kit)
Содержание British Gas 100 RD2
Страница 1: ......
Страница 40: ...40 British Gas 100 125 RD2 Installation Servicing SHORT LIST OF PARTS 66 SHORT PARTS ...
Страница 43: ...43 British Gas 100 125 RD2 Installation Servicing NOTES ...