background image

Page 3 

 

Required Standards and Equipment 

• 

Precision AC voltage source with a range of 0 to 200V AC @60Hz with an accuracy of .25% or better. 

• 

To test the performance of the 61-796, you will need a set of fixed standard resistors with an accuracy 
of 0.5% or better. Values required are 1

, 10

, 100

, and 1000

• 

All three test leads should be of equal length. 

C

 and 

P

 lead connections should be made at 

the standard resistors. This Source/Since method will reduce the lead resistance error in 
the measurement.  See Figure 1 below. 

 

 

Figure 1 

 

E, P, and C should be equal in length 

and as short as possible 

For best results P and C should be 

connected together at the measurement 

points as shown in this figure

.

 

 
 
 
 
 
 

 
 
PERFORMANCE VERIFICATIONS

  

 
Perform the following analysis.  If the meter conforms to the limits listed in Table 1, steps 1 - 6, the meter is 
functioning correctly.  If the meter does not conform to any of the listed limits, the calibration procedure must be 
performed. 
 

Battery Test 

• 

Remove the battery cover and use a calibrated meter to ensure the battery pack measures a minimum of 
11.5V DC.  If the battery pack measures under 11.5V DC, replace all 8 x 1.5V batteries before 
beginning the performance test. 

 

Frequency Test 

• 

Turn the function switch to 

20

 range,  

• 

Connect a frequency counter to terminals 

E

 and 

P

.  

• 

Press and lock the 

TEST

 button.  The output frequency should be 820Hz ±15Hz (805Hz~835Hz). 

 

Resistance Test 

• 

Connect the standard resistors to the unit under test as described in Figure 1. 

• 

Select 

20

 range. 

• 

Short 

E

P,

 and 

C

 together, adjust 

0

 adj

 dial for 0.00 ±0.01 ohms on the LCD display. 

• 

Connect 

E

P,

 and 

C

 to the 1.0

 standard resistor and verify the reading in Table 1, step 1. 

• 

Repeat this process for steps 2 - 6 in Table 1. 

• 

It is not necessary to do the 

0

 adj

 in the 200 and 2000 range.  

• 

If the display reading falls outside of the range shown in Table 1, the meter does not meet specification. 

Note: 

Error for the lead resistance is not included or accounted for in the test data in Table 1 

 
Table 1.  Resistance Test  

Step 

Range 

Input 

Low Limit 

High Limit 

1 20 

1.00

Ω

 

0.90 1.10 

2 20 

10.00

Ω

 

9.90 10.10 

3 200  10.0

Ω

 

9.6 10.4 

4 200  100.0

Ω

 

97.8 102.2 

5 2000  100.0

Ω

 

96 104 

6 2000  1000.0

Ω

 

978 1022 

 

 
Form number TM61796   

Rev 2 May 2008 

Содержание 61-796

Страница 1: ...following information Precautions and safety information Specifications Performance test procedure Calibration and calibration adjustment procedure Basic maintenance Disassembly Troubleshooting Spare Parts list Form number TM61796 Revision 2 Date May 2008 Form number TM61796 Rev 2 May 2008 ...

Страница 2: ...nd Voltage Potential Specifications 2 Required Standards and Equipment 3 Performance Verifications 3 Battery Test 3 Frequency Test 3 Resistance Test 3 AC Voltage Test 4 Disassembly and Setup For Calibration 4 Calibration 4 Procedure 4 5 Calibration Verification Test 5 Calibration Adjustment Locations 6 Component Layout 7 Troubleshooting 8 Spare Parts List 9 Form number TM61796 Rev 2 May 2008 ...

Страница 3: ...is manual a Warning identifies conditions and actions that pose hazard s to the user a Caution identifies conditions and actions that may damage the meter or the test instruments The Symbols The symbols used on the meter and in this manual are explained in Table A Table A Symbols Meter Safety Symbol Description Battery Cautionary or important information in manual Danger Risk of electrical shock D...

Страница 4: ...0 D Weight Approximately 3 0 lbs 1361g including battery Storage Environment 32 F to 122 F at 80 relative humidity Operating Environment Relative Humidity 32 F to 104 F 80 Relative Humidity Accessories included Hard Case Test Lead Set red 33m yellow 33m green 5m Red 1m dual input jack to alligator clip adapter lead 2 Auxiliary earth spikes and Instruction Manual RANGES and ACCURACY SPECIFICATION M...

Страница 5: ...librated meter to ensure the battery pack measures a minimum of 11 5V DC If the battery pack measures under 11 5V DC replace all 8 x 1 5V batteries before beginning the performance test Frequency Test Turn the function switch to 20Ω range Connect a frequency counter to terminals E and P Press and lock the TEST button The output frequency should be 820Hz 15Hz 805Hz 835Hz Resistance Test Connect the...

Страница 6: ...ion Qualified personnel should only perform calibration procedures described in this manual During this calibration it will be necessary to have the electronics of the instrument exposed A potential for hazardous voltage can be present during this procedure Use extreme caution ACV Adjustment refer to Figure 2 Turn the function switch to EARTH VOLTAGE position Press and lock the TEST button The dis...

Страница 7: ...nnect E P and C to the 100Ω standard resistor adjust VR4 for a reading of 100 0Ω 0 2 Select 2000Ω stage Short E P and C together check that the display reads 000 2 Connect E P and C to the 1000Ω standard resistor adjust VR5 for a reading of 1000Ω 2 Ω Calibration Verification Test The maximum allowable error just after calibration should not exceed those listed in Table 3 Table 3 Ω Verification Tes...

Страница 8: ...Page 6 Calibration Adjustment Locations VR6 ADJUST ACV VR1 ADJUST Hz VR3 ADJUST 10Ω VR4 ADJUST 100Ω VR5 ADJUST 1000Ω Figure 2 Form number TM61796 Rev 2 May 2008 ...

Страница 9: ...Page 7 Figure 3 Form number TM61796 Rev 2 May 2008 ...

Страница 10: ... or CON2 broken Replace U21 IC 5106Q or CON2 Power transformer broken Replace power transformer PT 1505 Hz no reading C6 C10 broken Replace C6 CPE 220uF C10 CDM 1uF C21 or Z2 broken Replace C21 CPE 22uF or Z2 TVS 6 5CA Fuse broken Replace Fuse ACV no reading U14 broken Replace U14 IC 062 ACV reading abnormal Diode broken Replace Diode ACV 0 no test Z2 broken Replace Z2 TVS 6 5CA Power transformer ...

Страница 11: ...ate 3 2 UP cover 1 3 PCB 2 4 Function switch 1 5 Test button 1 6 Hold button 1 7 0 Ω adjust 1 8 Housing case 1 9 Protection cover 4 10 Battery 8 11 Battery case 1 12 Handle 1 13 Latch 1 Others Test leads 1 Kit Simplified measurement probe 1 Auxiliary earth spikes 2 Shoulder belt 1 Instruction manual 1 ...

Отзывы: