
Page 3
PERFORMANCE VERIFICAITONS
Perform the following analysis, if the meter conforms to the limits listed in Table 1 the meter is functioning
correctly. If the meter does not conform to any of the listed limits the calibration procedure must be
performed.
Performance Verification Preparation
1. Turn on the Calibrator, allow calibrator to warm up. Temperature Stabilization
should be reached after 30 minutes.
2. Remove battery cover and using a calibrated meter to ensure the battery measures a minimum of 7.5V
DC. If the battery measures under 7.5V DC, replace the battery before beginning the performance test.
3. Input the values listed in Table 1
Table 1 Performance Verification
Function
Setting/Range
Input
Low Limit
High Limit
ACV 200
ACV 200
190V AC @ 50Hz
190V AC @ 500Hz
187.3
185.8
192.7
194.2
ACV 600
ACV 600
500V AC @ 60Hz
500V AC @ 500Hz
490
486
510
514
DCV 600
500V DC
496
503
ACA 200A
100A @ 50Hz
97.9
102.1
ACA 200A
100A @ 500Hz
96.0
104.0
ACA 1000A
1000A @ 50Hz
979
1021
DCA 200A
DCA 1000A
100A
1000A
98.0
980
102.0
1020
Hz
Hz
2.0 KHz @ 80V rms
20 KHz @ 80V rms
1.995
19.95
2.005
20.05
Ω
2K
1.000K .987
1.013
Ω
200K
100.0K 98.7
101.3
Diode Test
.500V
DC
.467
.533
Continuity Test
20
Ω
, Beep on
40
Ω
, Beep off.
Form number TM61724
Rev 2 Sept 2006