15
Mexico Super RS440 - RS470 -
Installation & Servicing
INSTALLATION
13 FITTING THE FLUE ASSEMBLY
Flue terminal shown in position
A.
Air duct join
B.
Flue duct join
1.
Remove the 2 screws and separate the
terminal grille, terminal air duct and terminal
flue duct.
2.
From OUTSIDE of the building, pass the
terminal air duct through the wall opening and
slide it into the extension air duct, locating it
as shown.
3.
Push the duct fully in until the fixing brackets
contact the wall face.
4.
Ensure that the duct is level and make good
between the wall and the duct from OUTSIDE
of the building.
5.
From OUTSIDE the building, seal the
duct join (A) with the mastic provided.
6.
From OUTSIDE the building, pass
the terminal flue duct through the wall
opening and slide it into the boiler
flue duct pushing the flue duct fully in,
up to the locating stops. Locate it as
shown.
7.
From OUTSIDE of the building, seal
the duct join (B) with the mastic
provided.
8.
Fasten the terminal grille to the duct
assembly.
5.
Terminal grille assembly.
6.
Terminal grille.
7.
Securing screws - 2 off.
8.
Splitter plate.
Legend
1.
Boiler air duct.
2.
Boiler flue duct.
3.
Terminal air duct.
4.
Terminal flue duct.
INST
ALLA
TION
200941-1.p65
3/3/2004, 10:25 AM
15