29 SCHEDULE
SERVICING
To ensure the continued safe and efficient operation of the
appliance it is recommended that it is checked at regular
intervals and serviced as necessary. The frequency of
servicing will depend upon the installation condition and
usage but should be carried out at least annually .
It is the law that any service work must be carried out by a
CORGI registered installer.
a.
Light the boiler and carry out a pre-service check, noting
any operational faults.
b.
Clean the main burner.
c.
Clean the heat exchanger.
d.
Clean the main injectors.
e.
Check the condition of the thermocouple.
f.
Check that the flue terminal is unobstructed and that the
flue system, including the flue cleanout cover, is sealed
correctly.
g.
If the appliance has been installed in a compartment,
check that the ventilation areas are clear.
The servicing procedures are covered more fully in Frames 30
to 35 and MUST be carried out in sequence.
WARNING.
Always turn OFF the gas supply at the gas service
cock and switch OFF and DISCONNECT the electrical supply
to the appliance
BEFORE SERVICING.
IMPORTANT.
After completing the servicing or exchange of
components always test for gas soundness and carry out
functional checks as appropriate.
30 BOILER CASING REMOVAL
SER
VICING
1.
Lift off the door.
2.
Remove the 2 screws and lift off the grille assembly.
3.
Remove the gas valve electrical cover and disconnect
the electrical leads.
4.
Release the gas valve lead from the retaining clip.
5.
Remove the thermostat phial from the pocket as
shown.
6.
Remove the 2 screws securing the control panel and
pull down to release the tabs from under the top panel.
7.
If the boiler is not fitted under a worktop, access for flue
cleaning will be improved by removing the top panel.