9
Mexico Super RS 3/60P - 3/100P -
Installation
3 BOILER ASSEMBLY - Exploded View
Mexico Super RS 3/60P with casing removed.
INSTALLATION
INST
ALLA
TION
LEGEND
1.
Heat exchanger assy.
2.
End section.
3.
Middle section.
4.
Section alignment rings and 'O' rings.
6.
Thermostat pocket.
7.
Distributor tube.
8.
Combustion chamber.
12.
Collector hood.
13.
Cleanout cover.
14.
Front plate assy.
22.
Gas control valve.
24.
Piezo igniter.
28.
Gas cock.
34.
Phial clip.
35.
Split pin
46.
Air duct assy.
47.
Boiler base plate.
52.
Heat shield.
Содержание Mexico Super RS 3/100P
Страница 1: ......
Страница 33: ...33 Mexico Super RS 3 60P 3 100P Installation LIST OF PARTS 57 SHORT PARTS ...