19
Mexico Super RS 3/60P - 3/100P -
Installation
INSTALLATION
25 INITIAL LIGHTING
1.
Turn the gas service cock to OFF and undo the union
nut.
2.
Remove the 4 wing nuts and withdraw the burner and
controls assembly, complete, from the boiler.
3.
Invert the burner assembly and reconnect to the gas
service cock.
4.
Turn the gas service cock to ON.
5.
Light the pilot burner. Refer to Frame 25.
6.
Test for gas soundness around the pilot burner
connection, using leak detection fluid.
7.
Turn the gas service cock to OFF and return the
burner and controls assembly to the normal working
position.
INST
ALLA
TION
26 PILOT BURNER CONNECTION GAS SOUNDNESS
LEGEND
A
Gas control knob
B
Burner pressure test point
C
Main burner pressure
adjuster
D
Inlet pressure test point
E
Gas service cock
F
Sightglass
G
Piezo unit ignition
H
Boiler thermostat knob
J
Overheat thermostat reset
button (optional)
1.
Connect the gas valve electrical leads and refit the cover.
2.
Check that the gas service cock (E) is ON and that the boiler
thermostat control knob (H) is OFF.
3.
Loosen the screw in the burner pressure test point (B) and
connect a gas pressure gauge via a flexible tube.
4.
Turn the gas control knob (A) CLOCKWISE until resistance
is felt and then release it.
5.
Push in and retain fully depressed the gas control knob (A).
Press and release the piezo unit button (G) repeatedly until
the pilot is seen to light through the sightglass (F).
6.
Hold the gas control knob (A) depressed for 15 seconds
after the pilot burner has ignited, then release.
If the pilot burner fails to remain alight at this stage, repeat
the procedure detailed above but wait longer than 15
seconds before releasing the gas control knob (A).
7.
Check the appearance of the pilot flame to ensure that it
envelops the tip of the thermocouple and is approximately
25mm (1") long. The pilot flame is factory set and no
adjustment is possible.
8.
Switch the boiler thermostat control knob (H ) to position 6
and check that the burner cross-lights smoothly from the
pilot flame.
9.
Test for gas soundness around the boiler gas component
joints, using leak detection fluid.
10.
Operate the boiler for 10 minutes to stabilise the burner
temperature. The boiler is pre-set at the factory to its
maximum nominal rating
11
. Turn the boiler thermostat knob (H) to OFF.
12.
Remove the pressure gauge and tube. Retighten the screw
in the pressure test point, ensuring that a gas-tight seal is
made.
RS 3/60P Burner / controls assembly shown
Содержание Mexico Super RS 3/100P
Страница 1: ......
Страница 33: ...33 Mexico Super RS 3 60P 3 100P Installation LIST OF PARTS 57 SHORT PARTS ...