4
Mexico Super 100 FF & 125 FF -
Installation
INTRODUCTION
Mexico Super FF
above range
is of floor standing,
fanned flue gas boilers. They are range-rated to provide
central heating outputs of 23.4 kW (80,000 Btu/h) to
36.6 kW (125,000 Btu/h).
The boiler has a cast iron heat exchanger and is
supplied fully assembled, complete with a white
enamelled mild steel casing.
A door at the top of the casing front panel hinges down,
revealing the boiler thermostat control (and programmer,
if fitted).
The boilers are suitable, as standard, for connection to
open-vented systems ONLY - an overheat thermostat kit
is available to allow the boiler to be used on sealed water
systems.
The systems may be:
z
pumped or gravity circulating indirect DHW only
z
pumped central heating only
z
pumped central heating combined with either a
pumped or gravity circulating indirect DHW circuit.
OPTIONAL EXTRA KITS
Extension Duct kit
Programmer Kit
Fits neatly within the casing. Separate
fitting instructions are included with this
kit.
Overheat
is available to allow the boiler to be used
Thermostat Kit
on sealed water systems.
CONTENTS
Air Supply
. .....................................................................
7
Boiler Assembly - Exploded view
...............................
9
Boiler Clearances
.........................................................
6
Burner Assembly - Exploded view
...........................
43
Electrical Connections
...............................................
24
Electrical Diagrams
...........................................
24 & 25
Electrical Supply
...........................................................
8
Extension Ducts - Fitting
...........................................
21
Fault Finding
...............................................................
38
Flue Fitting
.............................................................
13-21
Flue Installation
............................................................
7
Gas Safety Regulations
...............................................
5
Gas Supply
....................................................................
7
Initial Lighting
.............................................................
28
Installation
.....................................................................
9
Mandatory Requirements
.........................................
5-6
Pump
............................................................................
23
Servicing
......................................................................
30
Short List of Parts
......................................................
39
System Diagrams (Electrical)
....................................
26
Terminal Guards
. ..........................................................
7
Water Connections
..............................................
5 & 22
Water Circulation
..........................................................
8
Water Systems
............................................................
23
Water Treatment
............................................................
8
NOTE TO THE INSTALLER: LEAVE THESE
INSTRUCTIONS ADJACENT TO THE GAS METER.
ALSO COMPLETE THE BENCHMARK LOG BOOK
AND GIVE THIS TO THE CUSTOMER.
GENERAL
Mexico Super FF
Natural Gas only
Appliance type: C
12
Certified - P.I. No. 87AU83
Destination Countries: GB & IE.
Mexico Super 100 FF
G.C. No. 41 349 83
Mexico Super 125 FF
G.C. No. 41 349 84
Содержание Mexico Super 100 FF
Страница 1: ......
Страница 40: ...40 Mexico Super 100 FF 125 FF Installation LIST OF PARTS 76 SHORT PARTS ...
Страница 45: ...45 Mexico Super 100 FF 125 FF Installation ...