INSTALLATION
15 CASCADE FRAME KITS
16 INSTALLATION OF MULTIPLE BOILERS
In installations where the heat load is greater than the boiler
capacity an ideal solution is to use multiple boiler arrange-
ments.
There are many variations available to suit most commercial
applications.
Multiple boiler layout incorporating room sealed application.
Modular flue arrangements using a single combined header can be used.
For further advice or additional information on multiple arrangements contact
Caradon Ideal Ltd.
KEY
1. Non-return Valve
2. Relief Valve
3. Service Valve
4. Expansion Vessel
5. Mixing Header
6. Flow Sensor
7. System pump
8. By-pass
9. Flow control
10.Outdoor Sensor
11.MBC 5
12.Flue gas Terminal
459140
499004
15
Maximiser SE
- Installation
1
2
3
3
3
4
5
6
7
8
KEY
1. 2 boiler basic frame
2. additional single frame
3. support foot
4. main return pipe
5. main flow pipe
6. main gas supply pipe
7. boiler connection kit
8. hydraulic header
2 and 3 Boiler Frame Kits, shown above, are available as options to mount the boilers remote from the wall of the boiler house.