background image

21

Installation and Servicing

 

SECTION 2 - INSTALLATION

UNPACKING....CONT’D

Pack B Contents Telescopic (60/100)

Telescopic flue terminal

Flue turret

Wall seal (black)

D Screw

Sealing Tape

Wall Seal (White)

D

C

A

E

F

B

Pack B Contents Non-Telescopic (60/100)

Flue terminal

Flue turret

Wall Seal (white)

Cutting Aid

Wall Seal (black)

A

B

C

E

D

Pack B Contents Rear Flue Outlet Kit (55/80)

Plastic Connector

Flue Terminal

Rubber terminal wall seal

2 x Self Tapping Screws

Sealing Tape

Cutting Aid

B

A

F

C

D

E

Note.  

This flue system incorporates a removable flue outlet nose that utilises a push fit location system.  This enables the 

installation of deflector, high level or  balcony outlet flue kits without the removal of the whole ‘B’ pack terminal.  The appliance 

must not be operated without the desired  outlet nose correctly fitted in place.    

Note. Location dimples must be aligned with terminal mounting frame.

INST

ALLA

TION

2.3  FRONT PANEL REMOVAL

1.

  Loosen the 2 screws retaining the front panel.

2.

  Pull the two clips downwards to disengage.

3.

  Pull the front panel forward and upwards to remove.

1

2

Содержание LOGIC MAX HEAT H 18

Страница 1: ...re Do not use reconditioned or copy parts that have not been clearly authorised by Ideal Boilers For the very latest copy of literature for specification and maintenance practices visit our website id...

Страница 2: ...12 1 15 1 18 0 24 3 30 3 Part Load P1 kW 3 9 4 9 5 9 8 0 9 9 Auxiliary Electricity Consumption Full Load elmax kW 0 020 0 021 0 026 0 042 0 048 Part Load elmin kW 0 012 0 012 0 013 0 013 0 013 Standb...

Страница 3: ...VI Class VII Class VIII 1 2 1 5 2 3 4 3 5 5 PRODUCT FICHE The energy efficiency of the package of products provided for in this document may not correspond to its actual energy efficiency once install...

Страница 4: ...4 Installation and Servicing...

Страница 5: ...T PROCEDURE To restart the boiler press the RESTART button The boiler will repeat the ignition sequence if a heat demand is present NOTES FOR THE INSTALLER Relevant Installation changes implemented in...

Страница 6: ...6 Installation and Servicing...

Страница 7: ...he Roof Flue Kit 32 2 19 Condensate Drain 33 2 20 Connections 35 2 21 Electrical Connections 35 2 22 Installer Wiring 36 2 23 Installer Wiring Plan Diagrams 37 2 24 Wiring Diagram 38 2 25 Commissionin...

Страница 8: ...by 26 8 c For ft3 h divide the gross heat input Btu h by the gross C V of the gas Btu ft3 d For m3 h multiply l s by 3 6 Key to symbols GB United Kingdom IE Ireland Countries of destination PMS Maximu...

Страница 9: ...rs only Scale reducer 18 Hot water mode Heat input to be calculated Max operating burner pressure n a Max operating water pressure measure record Cold water inlet temp measure record Hot water outlet...

Страница 10: ...thin the system filter box Be sure to follow Ideal system filter installation and maintenance guide for correct method of installation Failure to install the system filter correctly will affect boiler...

Страница 11: ...vice not approved by Ideal Boilers could invalidate the certification and the normal appliance warranty It could also infringe the Gas Safety Regulations and the above regulations 1 6 SAFE HANDLING OF...

Страница 12: ...mes 3 Minimum acceptable spacing from the terminal to obstructions and ventilation openings are specified in Table 3 Only one reduction down to 25mm is allowable per installation otherwise BS5440 1 20...

Страница 13: ...1 15 CONDENSATE DRAIN Refer to Section 2 19 A condensate drain is provided on the boiler This drain must be connected to a drainage point on site All pipework and fittings in the condensate drainage...

Страница 14: ...building where wall thicknesses do not exceed 600mm Where the space into which the boiler is going to be installed is less than the length of flue required the flue must be fitted from the outside Ins...

Страница 15: ...oiler is not exceeded 4 Adjust room and cylinder thermostats and programmer to NORMAL settings The system should be vented directly off the boiler flow pipe as close to the boiler as possible The cold...

Страница 16: ...hould be positioned so that the discharge of water or steam cannot create a hazard to the occupants of the premises or cause damage to electrical components and wiring 3 Pressure Gauge A pressure gaug...

Страница 17: ...st be adequate to accept the expansion of the system water when heated to 110o C c The charge pressure must not be less than the static water head above the vessel The pressure attained in the system...

Страница 18: ...ORTANT The application of any other treatment to this product may render the guarantee of Ideal Boilers Invalid The Ideal System Filter will aid against the build up of iron oxide debris however the b...

Страница 19: ...R 223 FLUE MANIFOLD 2 1 BOILER ASSEMBLY Exploded View 224 FLUE MANIFOLD TOP 225 FLUE MANIFOLD TOP SEALING CAP 226 FLUE MANIFOLD REAR SEALING CAP 227 CLAMP RETAINING FLUE TURRET 228 HOSE CONDENSATE INT...

Страница 20: ...nd check the contents Pack A Contents A Boiler B Hardware Pack C Wall Mounting Plate D These Installation Users Instructions E Wall Mounting Template located on internal protective packaging F Boiler...

Страница 21: ...D 2 x Self Tapping Screws E Sealing Tape F Cutting Aid B A F C D E Note This flue system incorporates a removable flue outlet nose that utilises a push fit location system This enables the installati...

Страница 22: ...correct holes are drilled 1 Tape template into the required position ensuring its squareness by hanging a plumbline as shown 2 If fitting a side flue extend the flue centreline onto the side by 155mm...

Страница 23: ...the mounting face allowing the correct sealing of the components It is IMPORTANT that all attachments are fitted in accordance to the installation instructions provided with them The TURRET supplied i...

Страница 24: ...Frame A WALL Edge of turret to outside face of wall plus 44mm flue length SIDE Fit towall A WALL Minimum clearance 5mm DETERMINING THE FLUE LENGTH AND FLUE PACKS REQUIRED CONT D Shows the flue require...

Страница 25: ...e outlet terminal is upper most 4 Drill a 3 5mm hole through one of the 2 outer side holes in the outer flue section into the inserted outer flue as shown Take care not to pierce the inner plastic flu...

Страница 26: ...l need to be refitted 9 When 1st mark is in line with the wall whilst holding the flue firmly push the white wall sealing flange to the wall until the 2nd of the two marks is just visible If the last...

Страница 27: ...s IMPORTANT that the rubber terminal wall seal is pressed against the outside wall to create an adequate seal between the flue and wall as shown in Figure 2 2 13 SETTING THE REAR FLUE LENGTH WALL THIC...

Страница 28: ...tween the plastic connector and the terminal air duct with the tape provided 6 Push the terminal assembly through the prepared hole in the wall until the rubber seal clears the outside wall Rest the a...

Страница 29: ...to the wall as this movement engages the rear flue air and flue seal 3 Screw the boiler bottom retaining bracket to the wall with the screw provided 4 Remove the top flue blanking disk Fill the conde...

Страница 30: ...made using a separately supplied vertical connector WEATHER PROOFING Where the flue passes through the roof line an adequate seal must be made This is achieved by using either Flat roof weather collar...

Страница 31: ...enetrate the shaded area of the roof Note The equivalent flue length resistance of the elbow kits are 90o elbow kit 1m 45o elbow kit 0 6m If chimney penetrates dotted area such that A is less than 300...

Страница 32: ...tor kit 3 Secure the vertical connector by applying downward pressure on the connector 4 Position the clamp on the top face of the flue manifold and push it horizontally backwards Locate both clamp lu...

Страница 33: ...harge point such as an internal soil and vent stack or internal kitchen or bathroom waste pipe etc fig 3 External Drain Connections The use of an externally run condensate drainage pipe should only be...

Страница 34: ...ipe Water Weather proof insulation Max 3m external pipework Limestone chippings 500 300 25 75 2 rows of three 12mm holes 25mm centres 50mm from the bottom of the tube facing away from the house Minimu...

Страница 35: ...position of the gas connection For additional gas supply information refer to Gas Supply on page 12 2 21 ELECTRICAL CONNECTIONS Wiring should be 3 core PVC insulated cable not less than 0 75mm2 24 x...

Страница 36: ...cable is retained into the strain relief as shown 7 Swing the control box back up into the operating position and re fit the front panel ensuring a good seal is made NOTE When making the mains electr...

Страница 37: ...PUR TIMER CH ON L N HW ON HW OFF Y PLAN VALVE LOGIC MAX HEAT H BOILER WITH Y PLAN SYSTEM br br o g y b b g y g g L N E L N E CH ON R S ON HW ON HW OFF C S ON FUSED SPUR TIMER CH ON L N HW ON HW S PLAN...

Страница 38: ...5V CH LIVE IGNITION LIVE PE X2 DHW LIVE X3 PUMP GND X9 X8 OWC OWC OPENTHERM OPENTHERM OPENTHERM 5V CHIP COM BUS TX CHIP COM BUS 24V CHIP COM BUS GND CHIP COM BUS 5V CHIP COM BUS RX MAINS LIVE MAINS N...

Страница 39: ...has been checked adjusted and preset at the factory for operation on the gas type defined on the appliance data plate DO NOT adjust the air gas ratio valve Having checked That the boiler has been inst...

Страница 40: ...ler mode knob B is OFF 5 Check that the gas service cock J is OPEN 6 Slacken the screw in the inlet pressure test point H and connect a gas pressure gauge via a flexible tube 7 Switch the electricity...

Страница 41: ...nitial pressure to the design requirement 6 Balance the system Refer to Section 1 21 7 Check the condensate drain for leaks and check that it is discharging correctly 8 Finally set the controls to the...

Страница 42: ...to the householder to ensure the greatest possible fuel economy consistent with the household requirements of both heating and hot water consumption Advise the User of the precautions necessary to pr...

Страница 43: ...rdance with BS7967 Parts 1 to 4 Flue Sampling Point Air Sample Point Ensure all caps and seals are re fitted after use SERVICING Note In order to carry out either servicing or replacement of component...

Страница 44: ...mbly 6 Inspect the injector for blockage or damage 7 Inspect fan outlet sealing gasket and replace if necessary 1 2 3 5 Injector SERVICING 3 2 BOILER FRONT PANEL REMOVAL REPLACEMENT REMOVAL 1 Loosen t...

Страница 45: ...MPORTANT The burner head is a ceramic plaque construction Care must be taken to ensure that the burner is not placed down upon its face as this may cause damage to the ceramic 6 Brush off any deposits...

Страница 46: ...n gaps are correct Refer to Sections 3 13 3 14 1 Ignition Electrode Flame Detection Reassemble the boiler in the following order 1 Ensure that the condensate trap siphon is full of water 2 Refit the b...

Страница 47: ...o drain the boiler See Section 3 20 item no 2 THE BOILER MUST NOT BE OPERATED WITHOUT THE FRONT PANEL FITTED 3 9 FAN REPLACEMENT 1 Refer to Section 3 8 2 Disconnect the electrical leads from the fan 3...

Страница 48: ...that the new gas seal supplied is located correctly in the injector housing 10 Check operation of the boiler Refer to Sections 2 26 2 27 3 11 BURNER REPLACEMENT 5 5 6 1 See Section 3 4 2 Refer to Sec...

Страница 49: ...heck the operation of the boiler Refer to Section 2 26 2 27 3 12 CONTROL RETURN THERMISTOR REPLACEMENT 1 Refer to Section 3 8 2 Disconnect the electrical leads from the thermistors 3 Unclip the flow t...

Страница 50: ...nd re assemble in reverse order ensuring that the the earth lead is replaced 6 Check operation of the boiler Refer to Sections 2 26 2 27 Flame Detection Electrode 12 5mm Straight edge 1 Refer to Secti...

Страница 51: ...n 4 3 16 GAS CONTROL VALVE REPLACEMENT 1 Refer to Section 3 8 2 Unplug the electrical lead connection from the gas control valve 3 Remove the outlet gas valve clip and slide the pipe upwards 4 Undo th...

Страница 52: ...eat then press RESTART button f Using central heating knob rotate clockwise or anticlockwise to show n for Natural Gas then press the RESTART button g Using central heating knob rotate clockwise or an...

Страница 53: ...lbow 12 Remove the screw retaining the flow pipe bracket and remove the bracket from its rear retention slot 13 Pull the flow pipe to the right to disengage from the heat exchanger 14 Remove the conde...

Страница 54: ...he drain valve 4 Remove the magnet Slowly open the inlet valve to control the flow Flush out the filter until the water runs clear 5 Close the inlet valve Close the drain valve 6 Reinsert the magnet R...

Страница 55: ...AN FAULT GO TO SECTION 4 9 CONTROL NO FLOW THERMISTOR FAULT GO TO SECTION 4 10 RETURN THERMISTOR FAULT GO TO SECTION 4 11 OUTSIDE SENSOR FAULT LOW MAINS VOLTAGE CONTACT ELECTRICITY PROVIDER NO CH NO H...

Страница 56: ...or continuity visual condition and position Refer to Section 3 14 Check if the condensate pipe is blocked Check flue is installed correctly Replace as necessary NO Check gas supply and rectify fault N...

Страница 57: ...lable at the Boiler Inlet 18 mbar Check the detection electrode and associated harness for continuity visual condition and position Refer to Section 3 14 Check if condensate pipe is blocked Check if f...

Страница 58: ...ter connected across the thermistor s terminal pins At 25 o C expect 9 700 10 300 Ohms At 60 o C expect 2 400 2 600 Ohms At 85 o C expect 1 000 1 100 Ohms Is the Thermistor value correct YES YES NO NO...

Страница 59: ...e Timer Room Stat This is not boiler fault Ensure Voltage is supplied to boiler by rectifying external wiring 4 13 NO DISPLAY Is there 230Vac to the boiler at L and N see Section 4 12 NO Supply power...

Страница 60: ...ls of approved Ideal Parts Distributors are available on www idealparts com Our Parts team are also available to help with your Ideal Spare Parts enquiries on 01482 498665 When calling and to ensure w...

Страница 61: ...61 NOTES Installation and Servicing...

Страница 62: ...62 Installation and Servicing SECTION 5 SPARE PARTS...

Страница 63: ...fields on the commissioning checklist completed in full To instigate the boiler guarantee the boiler needs to be registered with the manufacturer within one month of the installation To maintain the b...

Страница 64: ...priate Building Regulations and then handed to the customer to keep for future reference GAS BOILER SYSTEM COMMISSIONING CHECKLIST CONTROLS Programmable room thermostat Optimum start control Combinati...

Страница 65: ...larly and that the appropriate Service Interval Record is completed Service Provider SERVICE RECORD SERVICE 01 AND Where Possible AND Signature SERVICE 02 AND Where Possible AND Signature SERVICE 03 A...

Страница 66: ...lletin TB 008 where chimney flues are in voids The ECGA should be of the correct type as specified by BS 7967 Prior to its use the ECGA should have been maintained and calibrated as specified by the m...

Страница 67: ...bled fixed and supported as per instructions Check that flue and flue terminal are not obstructed Check that no seals e g Those on flue extensions have been displaced during installation Rectify if ne...

Страница 68: ...68 NOTES Installation and Servicing...

Страница 69: ...69 NOTES Installation and Servicing...

Страница 70: ...he code of practice for the installation commissioning servicing of central heating systems Ideal Boilers Ltd PO Box 103 National Avenue Kingston Upon Hull HU5 4JN Tel 01482 492251 Fax 01482 448858 Re...

Отзывы: