![Ideal Boilers Concord CXD 40-100 Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/ideal-boilers/concord-cxd-40-100/concord-cxd-40-100_installation-and-servicing-manual_616956016.webp)
16
Concord CXD -
Installation
16 ZONES WITH BI-DIRECTIONAL MOTORISED VALVES
IMPORTANT
Terminal L2 may control the appropriate
pump(s) directly, provided that the total
running or starting current does not
exceed 6A (resistive or inductive): if this
rating would be exceeded, then
appropriate switchgear must be used to
control the pumps indirectly.
Three zones are illustrated but the
principles may be extended as required,
provided the above conditions are met.
Each relay will then require as many
contacts as there are zones.
Overrun
Since any zone may be the load during
overrun, all zones MUST individually be
able to satisfy the conditions in the
foregoing paragraph. If not all zones can
do this then consider other means of
control, detailed on other sheets.
Normal operation
When any thermostat is satisfied while
others are calling for heat, power is
15 INTERNAL WIRING
v
violet
pk
pink
y/g
yellow/green
or
orange
y
yellow
w
white
br
brown
r
red
LEGEND
b
blue
bk
black
At the start of the next call for heat (or the next clock period)
valves on zones not calling for heat will motor shut.
Water circulation system - refer to page 5
INSTALLATION
INST
ALLA
TION
available via relay contacts to close the valve for that zone.
When all thermostats are satisfied (also when the clock period
ends) all relays will be off, so the zone valves which were open
will remain open for the pump overrun period.
Содержание Concord CXD 40-100
Страница 1: ......