32
Concord CXD -
Installation
PREPARATION OF SECTIONS
Each section should be brushed clean on all external surfaces
and any debris which may have accumulated within the section
should be removed via the bottom ports.
Section assembly - Refer to exploded view
6.
Take the back section (with 1/2" BSP. tappings in the top)
and lift it onto the combustion chamber so that the
combustion chamber back panel return is inside the section
rear lip. Locate a slotted steel ring and an ‘O' ring seal into
each of the 4 ports. It will be necessary to squeeze the
steel ring slightly to enable it to be pushed fully into the
recess.
7.
Lift a middle section onto the combustion chamber and
carefully offer it up to the back section until it engages the
projecting steel rings. It may be necessary to use a mallet
and hardwood block to ensure that the steel rings are
pushed fully into the recesses and that the sections are
butted up to each other.
Note.
Until the final section is fitted and the tie rods
fastened, the sections in the assembly are not fixed
together therefore CARE MUST BE TAKEN TO PREVENT
the installed section coming apart.
8.
Repeat the above procedure for all of the remaining
sections until the assembly is complete.
9.
Fit the 4 tie rods through the holes in the sides of the end
sections and fit a flat steel washer, a shakeproof washer
and a nut to both ends of each tie rod. Screw up all the
nuts equally, in turn, and finally tighten them to a torque of
38-41 Nm (28-30 lb ft).
10.
Fit the distributor tube assembly as described in Frame 8.
Fit the drain cock (refer to exploded view, Frame 49).
11.
On open vented systems a hydraulic test should be carried
out at 1 1/2 times the design pressure given in Table 2 for a
period of 30 minutes.
12.
On a pressurised system the test should be at twice the
design pressure for a period of 30 minutes.
13.
Fit the 4 coach bolts into the lugs at the bottom of the front
and rear sections. Secure with the nuts and washers
provided.
14.
Fit the flue baffles which are located between the fins.
15.
Fit the collector hood. Ensure the underside returns
running across the hood sit within the front and rear section
flueways. Fasten down using the four M6 screws and nuts
provided, through the front and rear fixing points.
16.
Locate the fibreglass rope in rear section grooves to form a
seal with the spillage skirts. Fit the spillage skirts onto the
collector hood using the self tapping screws provided.
17.
Refit the manifold assembly. Position the boiler insulation
over the gas line tie bracket. Fasten the bolt securing the
bracket to the front section before wrapping and securing
insulation around the boiler body.
50 INSTRUCTIONS FOR SITE ASSEMBLED BOILERS - continued
23.
The boiler is now ready for installation. Go to Frame 8 in
this publication and continue the installation from there.
19.
Fit the support angles (contained in the platework package)
to the collector hood. The angle with the hole for the earth
screw fits to the front.
20.
Fit the gas inlet pipe bracket to the rear support angle on
the LH side using the self tapping screws.
21.
Fit the gas inlet pipe and make good the union between the
gas cock and the valve inlet pipe.
22.
Fit the Nox duct using the reverse procedure to that shown
in Frame 36 and secure with the extended nuts.
SITE ASSEMBLY
18.
Insert the burner rear
supports into the slots
at the back of the
combustion chamber.
Lift the front of the
burners over the
injectors and pull
forward to engage.
Содержание Concord CXD 40-100
Страница 1: ......