bp
TESTING OF DRAIN PIPING
After the piping work is finished, check if drainage
flows smoothly.
• Add approximately 1L of water gradually through
the air discharge outlet. Method of adding water
(See the figure to the right).
• When electric wiring work is finished, check
drainage flow during COOL running (See
Test
operation
, page 17).
GENERAL INSTRUCTIONS
• All field wiring and components must be installed
by a licensed electrician and must comply with
relevant local and national regulations.
• Use copper wire only.
• Follow the 'wiring diagram' attached to the unit
body to wire the outdoor unit, indoor units and
the remote control.
• A circuit breaker capable of shutting down power
supply to the entire system must be installed.
• Note that the operation will restart automatically
if the main power supply is turned off and then
turned back on again.
• Be sure to ground the air conditioner.
•
DO NOT
connect the ground wire to gas pipes, water
pipes, lightning rods, or telephone ground wires.
HOW TO CONNECT WIRING
• Remove the control box lid of the indoor unit.
Remove the cover of the outdoor unit.
• Follow the "wiring diagram label" attached to the
indoor unit's control box lid to wire the outdoor
unit, indoor unit and the remote control.
Securely fix the wires with a field supplied clamp.
• Attach the cover of the outdoor unit.
THE SPECIFICATION OF POWER
1 Plastic watering can(tube should be about 100 mm/3.9"long)
2 Water-receiver
1
2
100/3.9"
Fresh air intake (65/2.6")
106/4.2"
106/4.2
"
75/3"
65/2.6"
Unit: mm
1 Control box lid
2 Wiring diagram label
3 Power supply terminal block
4 Clamp for wiring
5 Wiring between units
6 Plastic cover
7 Clamp (field supply)
1
2
4
5
6
3
7
Phase
Frequency and volt Circuit breaker/Fuse(A)
9K~18K
1Phase
208-240V
20/16
Model
Power
ELECTRIC WIRING WORK
I