background image

MD ARM INSTALLATION INSTRUCTIONS - rev  04/22/14 pjm

Page 2 of 3

MD ARM INSTALLATION INSTRUCTIONS

ADJUST BALL VESA

TENSION & HEIGHT

Use  the  slider  knob  to 

loosen the slider to adjust 

the height of the monitor 

on the Paralink.

Adjust  the  pivot  tension 

of the ball by gently and 

evenly  tightening  or 

loosening the four screws 

on  the  back  of  the  ball 

VESA.

Slider Knob

Pivot tension 

adjustment 

screws

ATTACH VESA TO MONITOR

Attach VESA to 

monitor using four 

4mm screws in the 

hardware bag.

ADJUST

PARALINK TILT

Adjust monitor to desired 

position with ball VESA. 

Tilt  your  monitor  50° 

in  any  direction. Adjust 

your  monitor  between 

portrait  and  landscape 

by  rotating  ball  VESA. 

Adjust  monitor  depth 

by  moving  the  paralink 

forward  or  back  then 

t i g h t i n g   t h e   d e p t h 

adjustment knob.

Depth 

Adjustment 

Knob

ATTACH THE THBV HANDLE

The THBV is attached 

to  the  Paralink  and 

Quicklink 

by 

two 

screws on the back of 

the VESA plate.

Screw 

to attach 

handle.

Screw 

to attach 

handle.

ATTACH

PARALINK 

TO MD ARM

Attach  the  Paralink  to 

MD  arm  using  3/8  bolt 

assembly  and  1”  bearing 

assembly  provided.  Insert 

bolt  assembly  up  through 

ear at end of arm. Place 1” 

bearing assembly over bolt 

on top of ear. Place Paralink 

over bolt and bearing and 

turn  bolt  until  Paralink  is 

secure and smoothly  turns 

against the bearing.

Beauty cap

3/8 bolt

1” bearing

Отзывы: