MD ARM INSTALLATION INSTRUCTIONS - rev 04/22/14 pjm
Page 2 of 3
MD ARM INSTALLATION INSTRUCTIONS
ADJUST BALL VESA
TENSION & HEIGHT
Use the slider knob to
loosen the slider to adjust
the height of the monitor
on the Paralink.
Adjust the pivot tension
of the ball by gently and
evenly tightening or
loosening the four screws
on the back of the ball
VESA.
Slider Knob
Pivot tension
adjustment
screws
ATTACH VESA TO MONITOR
Attach VESA to
monitor using four
4mm screws in the
hardware bag.
ADJUST
PARALINK TILT
Adjust monitor to desired
position with ball VESA.
Tilt your monitor 50°
in any direction. Adjust
your monitor between
portrait and landscape
by rotating ball VESA.
Adjust monitor depth
by moving the paralink
forward or back then
t i g h t i n g t h e d e p t h
adjustment knob.
Depth
Adjustment
Knob
ATTACH THE THBV HANDLE
The THBV is attached
to the Paralink and
Quicklink
by
two
screws on the back of
the VESA plate.
Screw
to attach
handle.
Screw
to attach
handle.
ATTACH
PARALINK
TO MD ARM
Attach the Paralink to
MD arm using 3/8 bolt
assembly and 1” bearing
assembly provided. Insert
bolt assembly up through
ear at end of arm. Place 1”
bearing assembly over bolt
on top of ear. Place Paralink
over bolt and bearing and
turn bolt until Paralink is
secure and smoothly turns
against the bearing.
Beauty cap
3/8 bolt
1” bearing