
7. Pump 5…10 times to ventilate the ventilation channels.
8. Turn the pressure relief valve clockwise until it is tightly closed.
9. Connect the pressure hose to the MINIMESS
®
connection of the
ICP 700 T
, and tighten
theconnection.
10. Tightly screw the MINIMESS
®
adapter on the pressure hose.
11. Select suitable adapters and seals for the connection of the test sample.
12. Screw the adapter for the test sample onto the MINIMESS
®
adapter.
13. Turn the test sample with seal in the adapter.
IMPORTANT! Do not tighten the test sample yet!
14. Pump until the hydraulic oil escapes at the connection of the test sample. The pressure
hose and the test sample connection are now ventilated.
15. Tighten the test sample.
5
Operation
CAUTION! Material damage to valve stop!
If the stop and the
ICP 700 T
are put under too much strain, they will be
damaged.
When the stop has been reached, tighten the valves (fine adjustment and pressure
relief valve) only hand-tight.
Read before pressure generation:
Before you generate pressure with the
ICP 700 T
, check whether the following
requirements are met:
The support surface of the
ICP 700 T
is level and has a flat surface.
The reference is connected to the
ICP 700 T
.
The test sample is connected to the pressure hose with suitable adapters and seals.
All pressure connections have a correct and pressure-resistant seat.
The
ICP 700 T
, the pressure hose and the test sample have been
properly ventilated (
Turn the seal to the appropriate position:
• "
C
L O
S
E" for transport and storage,
• "
V
E N T" for ventilation / generating or releasing pressure and
• "
O P E N" for checking the oil level / refilling / replacing.