background image

Содержание PGAA Series

Страница 1: ...ERMOSTAT HEAT ANTICIPATOR 8 Final ElectricalCheck 8 8 DUCTWORK 8 DuctworkInsulation 9 DuctworkConnections 9 FILTERS 9 9 START UP PROCEDURES 9 CHECKBEFORESTARTING 9 ReverseRotation Scroll CompressorsOn...

Страница 2: ...ordeath WARNING Hazardsorunsafepractices whichCOULDresultinseverepersonalinjuryor death CAUTION Hazardsorunsafepractices whichCOULDresultinminorpersonalinjuryor productor property damage Warning Label...

Страница 3: ...11 1 8 I 283 _ _ _ 12 I 306 _ 14 1 4 I 363 _ 14 1 4 I 363 _ 12 I 306 _ _ _ _ A 4 102 T 4 1 4 to8 _ _ E _ 12 1 4 311 _Xj _ _ _ _ 12 118 308 D H _ 14 1 4 363 y _ _O_ I 12 1 4 318 t 5 _ _ _ _ I 1 2 _ 53...

Страница 4: ...12 1 4 318 T 16 7 8 429 ROOF CURB for C Chassis 473 8 X 73 _M NCHE8 M_LL_METER8 A 67 3 4 1721 B 64 3 4 1645 C 23 584 D 23 584 E 2 1 2 64 F 42 3 4 1086 G 39 3 4 1010 H 23 584 I 12 305 J 12 305 K 14 356...

Страница 5: ...ice Side Front Combustion Air Inlet 30 Clearance between 3 Ft Overhang and Top of Unit 30 Combustible Base Wood or Class A B or C roof covering material 0 FIGURE 1 I Minimum Clearances and Access Pane...

Страница 6: ...ionsincludedwithcurb and allapplicablebuildingcodesinyour installation SeePages 2 or3 forappropri ate curbto use withyour model FIGURE 2 Blockoff Plate Return Air Compartment I FIGURE 3 l Heating Vent...

Страница 7: ...217 409 834 1 275 Gas Pipe Size Length and Btu hr Capacity FIGURE 6 for Schedule 40 Iron Pipe English Pipe Length Includes Fittings 3 4 2 6 1m 56 615 12 2m 38 425 18 3m 31 337 Pipe Length Includes Fit...

Страница 8: ...ecorrectorifices Gaugethesizeoftheorifices witha newtwistdrillbit ofthe correct size Makesurethat the orifices go instraightsothat theyforma right angle 90 to the manifoldpipe Tightenthe orifices soth...

Страница 9: ...gainst damage Caulkingand flash ings orother meansadequateto provide a permanentweatherseal should be used Ductworkinstalledin atticsor other areas exposedto outsidetemperaturesshould be installedwith...

Страница 10: ...ualsparking odorsorunusualnoisesareencountered shutoff electricpowerimmediately Recheckfor wiringerrors or obstructionsin ornear blowermotors 1 Set thermostatHeat Cool selectorto OFF 2 Set thermostatf...

Страница 11: ...eterminedthat coolingandheatingspeedsareneededon the same speedtap removethe red heatingleadfromthe speedtap blockandconnect itto the insulatedmaleterminalonthe blackcoolinglead Thenplacethe insulated...

Страница 12: ...lower for30ceconds 0ncethethermostatis satisfied thefan controlwilloperatetheblowerfor30 additional seconds SCROLL ANTI CYCLE TIMER Single phasescrollcompressor equippedunits are equipped withan anti...

Страница 13: ...condenserfan motor afterfive yearsof operationand everyfive yearsthereafter VENT ASSEMBLY Burn hazard Flue cover may be hot Allow adequate time for flue cover to cool Failure to follow this warning c...

Страница 14: ...rnersand clean the heat exchanger as required INSPECTION AND CLEANING OF BURNER ASSEMBLY HEAT EXCHANGERS FLUE GAS PASSAGES For Qualified Service Technician Only See FIGURE18 FIGURE19 and FIGURE20 fori...

Страница 15: ...S IN BASE RAL AS SHOWN IN DEw AlL A USE SPREADER BARS WHLN RGGNG TO PREVLNT UNIT DAMAGE BE SURE RIGGNG AND SHACK ES ARE SUFFCIENT TO HAND E WEGHT ISTED BE OW SPREADER BARS DETAIL A HEIGHT CAB NET B C...

Страница 16: ...14 Notes 16...

Страница 17: ...Warranty DOES NOT COVER any labor material refractory chambers oii nozzles refrigerant refrigerant inspection and refrigerant reclaiming freight and or handling charges associated with any repair or r...

Страница 18: ...CAC4 KAC0 TCA0 TCA2 TCA4 HHP0 HHP2 HHP4 CliP0 CliP2 CliP4 TCH0 TCH2 TCH4 PGME PYMC PHAD PGAD PA95 PAPC PAK APK Tothe original purchaser a replacement for 10 years from original date of installation o...

Отзывы: